Washington septic rules
Washington State Department of Health (DOH), Office of Environmental Health and Safety, Wastewater Management Section · On-Site Sewage Systems (OSS) Program. Statute: RCW 43.20.050; RCW 43.20.065; ch. 70A.105 RCW; ch. 70A.110 RCW. Rule: WAC 246-272A (revised WSR 24-06-046, effective 2025-04-01; property transfer inspection effective 2027-02-01).
For homeowners in Washington
- Local agencies permit septic systems under the state rule (WAC 246-272A (revised WSR 24-06-046, effective 2025-04-01; property transfer inspection effective 2027-02-01)). Find yours in the county list below.
- The state rule does not require a maintenance contract for aerobic units; 1 service visits a year.
- Homeowners may maintain their own unit after taking an approved course.
- A statewide inspection-at-sale rule is adopted but not yet in force.
Counties
The office that permits septic systems in each county, with the estimated number of systems and how many have an aerator or a pump. ● marks counties whose pump and aerator figures come from county records; the rest spread the state estimate.
What the state rule requires
- Administering body
- State Board of Health adopts WAC 246-272A; DOH registers proprietary treatment and distribution products, issues standards and guidance and regulates large OSS; local health jurisdictions (county/district health officers) issue permits, adopt local rules and management plans, and approve installers, pumpers and maintenance service providers
WAC 246-272A-0340(1)-(2); DOH rules page: “OSS installers, pumpers, and maintenance service providers need approval from the local health officer before working in that jurisdiction ... Each local health officer must set up approval procedures by February 1, 2025.” source
- Administration model
- State rule, local agencies permit
- Statute
- RCW 43.20.050; RCW 43.20.065; ch. 70A.105 RCW; ch. 70A.110 RCW
- Rule
- WAC 246-272A
- License required
- Yes
- License classes
- installer;pumper;maintenance_provider;inspector_pos
WAC 246-272A-0340; -0270(1)(k): “Approval of installers, pumpers, and maintenance service providers ... Beginning February 1, 2027, an inspection by a third-party inspector authorized by the health officer is required [at property transfer].” source
- Maintenance contract for aerobic or advanced units
- No
WAC 246-272A-0270(1)(e): “Owner responsibilities include ... securing and renewing periodic maintenance contracts and operation permits if required by the local health jurisdiction.” source
- Homeowner self-maintenance
- Allowed after a course
WAC 246-272A-0340(3): “Local health officers may create a homeowner OSS inspection certification process, but they aren't required to.” source
- Self-maintenance conditions
- Inspections must be by a maintenance service provider approved by the local health officer; a local health officer may (but need not) create a homeowner OSS inspection certification process (WAC 246-272A-0340(3)); owners must secure maintenance contracts only where the local health jurisdiction requires them (0270(1)(e))
- Service visits per year
- 1
WAC 246-272A-0270(1): “Sewage tank with gravity SSAS only: at least once every three years, unless the local health officer requires more often. All other OSS: annually, unless the health officer requires more often. Inspector: a maintenance service provider authorized by the local health officer.” source
- Reports go to the authority
- Yes
WAC 246-272A-0270(1): “Results go to the local health jurisdiction on a form approved by the health officer.” source
- Report channel
- Not stated
- Report platform
- Form approved by the local health officer; platform varies by local health jurisdiction
- Electronic monitoring in the rule
- Alarm requirement only
WAC 246-272A-0238(1)(c)(iii): “Audible and visual alarms designed to alert a resident of a malfunction. The alarm must run on a circuit separate from the pump circuit.” source
- Monitoring wording
- Pump systems: clearly accessible controls and warning devices are required, including ... audible and visual alarms designed to alert a resident of a malfunction, on a circuit separate from the pump circuit (WAC 246-272A-0238(1)(c)(iii)). No telemetry or remote-monitoring provision found in 246-272A-0238, -0270 or -0340.
- Alarm required
- Yes
WAC 246-272A-0238(1)(c)(iii): “Audible and visual alarms designed to alert a resident of a malfunction.” source
- Inspection at sale
- Adopted, not yet in force
WAC 246-272A-0270(1)(k); WSR 24-06-046: “The seller must provide available OSS maintenance and repair records, plus the seller disclosure statement under chapter 64.06 RCW. Beginning February 1, 2027, an inspection by a third-party inspector authorized by the health officer is required. Beginning February 1, 2027, proprietary treatment products must also be inspected per manufacturer recommendations by a third-party inspector. The health officer may waive the transfer inspection if compliance is documented and a prior third-party inspection exists.” source
- What triggers it
- Property transfer. Seller must now provide OSS maintenance and repair records and the ch. 64.06 RCW seller disclosure statement; beginning 2027-02-01 an inspection by a third-party inspector authorized by the local health officer is required at transfer, with proprietary treatment products also inspected per manufacturer recommendations; health officer may waive if compliance is documented and a prior third-party inspection exists (WAC 246-272A-0270(1)(k); CR-103 WSR 24-06-046 staggered effective dates)
DOH Chapter 246-272A WAC Rule Revision page; CR-103 filed 2024-03-01: “April 1, 2024: changes to WAC 246-272A-0110. February 1, 2025: Maintenance Service Provider approval requirement. April 1, 2025: all other provisions. February 1, 2027: property transfer inspection requirement.” source
- Who inspects
- Point-of-sale inspector
- Seller disclosure covers septic
- Yes
WAC 246-272A-0270(1)(k): “The seller must provide available OSS maintenance and repair records, plus the seller disclosure statement under chapter 64.06 RCW.” source
- Annual operating permit
- No
WAC 246-272A-0270(1)(e): “securing and renewing periodic maintenance contracts and operation permits if required by the local health jurisdiction.” source
- Fees and periodic programs
- No state operating permit or annual fee; owners must renew maintenance contracts and operation permits if required by the local health jurisdiction (0270(1)(e)); product registration and LOSS fees in WAC 246-272
- Approved product list
- https://doh.wa.gov/sites/default/files/2022-02/337-024.pdf
DOH Wastewater Forms and Publications page: “List of Registered On-site Treatment and Distribution Products (PDF) ... Proprietary On-site Wastewater Treatment Products (PDF) [RS&G]. The PDF is labelled DOH 337-024 August 2026.” source
- Effective date
- 2025-04-01
Systems in service
| Year | What | Low | Mid | High | Method | |
|---|---|---|---|---|---|---|
| 1990 | All systems | 630,646 | 630,646 | 630,646 | 1990 census | source |
| 2021 | All systems | 581,658 | 659,151 | 739,243 | USGS estimate (2025) | source |
| 2026 | All systems | 950,000 | 950,000 | 950,000 | State inventory | source |
Pumps and aerators
Estimated systems in Washington with an aerobic treatment unit (aerator), an effluent or dosing pump, or either. How these are estimated
- With an aerator
- 26,000
- 12,000 to 52,000 · 4% of all systems
- With a pump
- 200,000
- 120,000 to 320,000 · 31% of all systems
- Pump or aerator
- 210,000
- 130,000 to 330,000 · 32% of all systems
Control panels: about 210,000 installed (110,000 to 370,000), about 2,100 new a year and 14,000 replacements a year. How panels are estimated
State evidenceShares come from the state's permit records or county inventories.
Share from county records: Kitsap 7.4% aerobic and about 33% pumped of 53,000 typed systems; Clallam 2.5% ATU and about 39% pumped; Puget Sound management plans list 23-61% of systems as alternative (non-gravity).
- Kitsap Public Health District OSS Parcels layer (OSS_Parcels, OssSystemtype field) · high confidence
- Clallam County Onsite Septic System Status (parcel layer Clallam_par_OSS_stat_current, sys_type field), Clallam County Environmental Health · high confidence
- Washington DOH On-site Sewage Local Management Plan semiannual reporting (ArcGIS layer: On-site septic local management plans by county boundary view) · med confidence
- OSS_2019 Hood Canal Regional PIC Program Phase III septic category layer (Jefferson, Mason, Kitsap counties) · med confidence
Licensed professionals
No roster parsed yet.
Sources
- Clark County certified OSS inspectors (with designer 58850, installer 58851, pumper 58852 lists) · Clark County Public Health, pdf
- Washington list of registered on-site treatment products · Washington DOH, pdf
- Wastewater Forms and Publications (approved/registered products, RS&G documents) · Washington DOH, html
- Washington State Local Health Jurisdictions · Washington DOH, html
- On-site Sewage Systems (OSS) - DOH program page · Washington DOH, html
- Washington registered on-site treatment and distribution products · Washington State Department of Health, pdf
- Chapter 246-272A WAC Rule Revision (CR-103, concise explanatory statement) · Washington DOH, html
- Washington registered sewage tanks · Washington State Department of Health, pdf
- Grant County Health District online records portal · Grant County Health District, portal
- Island County Septic Professionals List (designers, installers, MSPs, pumpers) · Island County Public Health, pdf
- Find an on-site system maintainer in King County · Public Health - Seattle & King County, html
- Kitsap Public Health District Septic System Records Search · Kitsap Public Health District, portal
- Lewis County List of Certified Professionals (designers, installers, pumpers) · Lewis County Public Health and Social Services, html
- OnlineRME public septic record and inspection report search · OnlineRME (used by Snohomish, King, Pierce, Thurston, Clark, Mason, Island, Lewis LHJs), portal
- Puget Sound onsite sewage system inventory indicator · Puget Sound Partnership, web
- Skagit County certified O&M Specialists and pumpers (2026) · Skagit County Public Health, pdf
- Find a Septic Contractor (certified OSS contractors) · Snohomish County Health Department, html
- Spokane Regional Health District Operations and Maintenance Providers · Spokane Regional Health District, pdf
- DIY septic self-inspection pilot report (gravity systems) · Tacoma-Pierce County Health Department, pdf
- Septic System Service Companies certified to work in Pierce County · Tacoma-Pierce County Health Department, pdf
- Washington WAC 246-272A (property transfer inspection effective 2027-02-01) · Washington DOH, html
- Yakima Health District Licensed Designers and Installers · Yakima Health District, pdf