Tacoma-Pierce County Health Department, Environmental Health (Septic Systems)

Type
Health district
Area served
Pierce County (FIPS 53053)
Address
3629 S. D St., Tacoma, WA 98418-6813
Phone
(253) 649-1925 (septic); O&M (253) 649-1421
Permit platform
Online RME (O&M reporting, with Online RME fees letter); online application status search

Environmental Health Code ch. 2 On-Site Sewage (adopted 2018-07-18): Section 34 Report of System Status (RSS) required for every real estate transaction, with operational evaluation and pumping of all tanks; RSS valid one year; buyer may take responsibility for corrections within 90 days of transfer. Gravity systems can apply to reduce inspection frequency from every 3 to every 5 years; DIY gravity self-inspection pilot completed (2026 report). 2026 on-site fee schedule published.

Local rules

Administering body
Tacoma-Pierce County Board of Health / Tacoma-Pierce County Health Department
Rule
TPCHD Environmental Health Code ch. 2 On-Site Sewage (adopted 2018-07-18), Section 34
Reports go to the authority
Yes

TPCHD septic professionals page: “Certification info, application and reporting requirements ... Online RME Reporting User Guide” source

Report channel
Online portal

TPCHD septic professionals page: “Online RME Reporting User Guide: Updated March 2025.” source

Report platform
Online RME

TPCHD septic professionals page: “Online RME. ... Online RME Reporting User Guide ... Online RME fees letter.” source

Inspection at sale
Required by local ordinance

TPCHD EHC ch. 2 Section 34.A: “A real estate transaction for real property served by an OSS shall not be completed without a Report of System Status (RSS) issued by the Health Department; provided, properties where a new OSS has been installed for less than six months shall be exempt from this requirement.” source

What triggers it
Any real estate transaction for property served by an OSS needs a Report of System Status issued by the Health Department after a current operational evaluation and pumping of all tanks; new systems under six months exempt; one RSS per OSS; RSS expires one year after issue; unresolved defects may pass to the buyer under a contract or work order with 90 days to correct after title transfer

TPCHD EHC ch. 2 Section 34.B-C: “A current operational evaluation and pumping of all tanks is required for each OSS on the property ... One completed RSS application and fee shall be required for each OSS on the property.” source

Who inspects
Maintenance provider

TPCHD Selling Your Property page: “Contact a septic service company. Have your system inspected and the tanks pumped. ... We review the application, inspect the property, and ask that major deficiencies be resolved.” source

Fees and periodic programs
RSS application fee per OSS (amount not read; 2026 fee schedule published); gravity systems may apply to reduce O&M inspection frequency from every 3 to every 5 years; Online RME reporting fees letter
Effective date
2018-07-18

TPCHD EHC ch. 2 cover: “Adopted July 18, 2018” source

Model catalog of installed septic hardware, and septic rules, permitting authorities and licensed providers by state and county. Every fact links to its source. Manufacturer photos are linked, not copied.