Snohomish County Health Department, Environmental Health Division (On-site Sewage)
- Type
- County
- Area served
- Snohomish County (FIPS 53061), including septic areas inside cities such as Lynnwood and Mukilteo
- Address
- 3020 Rucker Avenue, Everett, WA 98201 (main office)
- Phone
- 425-339-5200
- Permit platform
- OnlineRME (records and contractor reporting); EnvisionConnect (online payments, permit search)
- SHD-EHQ@snoco.org
- Website
- https://www.snohd.org/
- Septic page
- https://www.snohd.org/157/Septic
- Provider list
- https://www.snohd.org/687/Find-a-Septic-Contractor
- Counties
- Snohomish County
Board of Health Code ch. 5.55 (BOH25-07) requires a health department certificate of competency for installation, monitoring and maintenance or pumping, and contractor reports to the department within 30 days through its electronic database. Ch. 5.60 (Ordinance BOH26-02, adopted April 2026) requires a Report of Property Transfer before any sale from 2026-11-01. Department states about 84,000 private septic systems and about 2,800 transfers a year. Savvy Septic program: rebates up to $200 after an online Septic Care Workshop.
Local rules
- Administering body
- Snohomish County Board of Health / Snohomish County Health Department
- Rule
- Snohomish County Board of Health Code ch. 5.55 On-Site Sewage System Contractor Regulations (BOH25-07); ch. 5.60 On-Site Sewage System Requirements for Real Estate Transactions (BOH26-02)
- License required
- Yes
SCBHC 5.55.040(A): “No person shall engage directly or indirectly in the installation, monitoring and maintenance, or pumping on all or any part of an OSS without first having obtained the applicable certificate of competency from the health department.” source
- License classes
- installer;maintenance_provider;pumper
SCBHC 5.55.040(A); 5.55.080: “installation, monitoring and maintenance, or pumping ... Pumpers ... Monitoring and Maintenance Specialists” source
- Reports go to the authority
- Yes
SCBHC 5.55.100(A): “OSS contractors performing monitoring and maintenance activities, pumping, and/or limited repairs on OSS ... shall report the activities to the health department within 30 days of completion” source
- Report channel
- Online portal
SCBHC 5.55.100(C): “The health department will maintain an electronic database for the purpose of submitting reports of monitoring and maintenance activities, pumping, as well as limited repairs.” source
- Report platform
- OnlineRME (health department electronic database)
SHD news 2026-10-27: “Septic records can be searched for in an online database called OnlineRME ... Along with as-builts, there are also inspection and pump reports.” source
- Inspection at sale
- Required by local ordinance
SCBHC ch. 5.60 (Ord. BOH26-02, pending 11/1/2026 effective date); SHD news 2026-10-27: “Beginning November 1, all septic systems must be inspected before a property is sold in Snohomish County. The new ordinance was adopted earlier this year by the Snohomish County Board of Health.” source
- What triggers it
- Sale of any property with an OSS from 2026-11-01: full inspection by a certified septic contractor within the past 12 months, pumping if recommended, site plan if no accurate as-built, then a Report of Property Transfer application and fee to the Health Department; RPT valid 12 months; exempt if the system was installed within the past 12 months; department cannot delay or stop sales
SHD Property Transfer page: “Have a full septic system inspection conducted by a certified septic contractor within the past 12 months ... Submit a Report of Property Transfer (RPT) application ... Application & fee cannot be submitted until November 1, 2026.” source
- Who inspects
- Maintenance provider
SHD Property Transfer page: “Have a full septic system inspection conducted by a certified septic contractor within the past 12 months.” source
- Seller disclosure covers septic
- Yes
SHD Property Transfer page: “Seller's disclosure statement in accordance with chapter 64.06 RCW” source
- Fees and periodic programs
- Report of Property Transfer fee (amount not read); contractor reports of monitoring, maintenance, pumping and limited repairs due within 30 days (5.55.100); Savvy Septic rebates up to $200
- Provider list
- https://www.snohd.org/687/Find-a-Septic-Contractor
- Effective date
- 2026-11-01
SCBHC ch. 5.60: “This chapter has been added by Ordinance No. BOH26-02, which is pending 11/1/2026 effective date.” source