Weber-Morgan Health Department, Environmental Health Division, Water Quality Bureau

Type
Health district
Area served
Weber and Morgan counties
Address
477 23rd Street, Ogden, UT 84401
Phone
801-399-7160

Health department completes site and soil evaluation after application; percolation test by an independent party; ground water monitoring January-May where indicated; permits valid one year, renewable for a fee; registered installers only (list supplied on permit approval); final inspection before backfill then letter of certification.

Local rules

Administering body
Weber-Morgan Health Department under its Onsite Wastewater Treatment Systems Regulation (amending R317-4 for Weber and Morgan counties)
Administration model
State rule, local agencies permit
Rule
Weber-Morgan Onsite Wastewater Treatment Systems Regulation (adopted 2013-11-25), sec. 1.4.B.1, 1.5.B.4.b
Maintenance contract for aerobic or advanced units
Yes, for the life of the system

Weber-Morgan Onsite Regulation 1.4.B.1.f: “Operating permits will only be issued to an individual. The individual must demonstrate ownership of the property, and will be responsible to maintain contracts with a contract service provider, and keep operating permits current” source

Reports go to the authority
Yes

Weber-Morgan Onsite Regulation 1.4.B.1.e.i: “The system has been inspected as required by R317-4 Table 7, by a contract service provider, and inspection results have been submitted to the Department within 30 days of completed inspection.” source

Inspection at sale
None

Weber-Morgan Onsite Regulation 1.4.B.1.g: “Operating permits will require a name change for any change of ownership of the property required to have a renewable operating permit. This requirement will be recorded on the deed of ownership, and changes made at time of sale.” source

Annual operating permit
Yes

Weber-Morgan Onsite Regulation 1.4.B.1.a: “Operating permits will be issued after final construction approval and shall be renewed annually.” source

Fees and periodic programs
Mound, packed bed media and pressure distribution systems need an annually renewed operating permit; renewal requires inspection per R317-4 Table 7 by a department-certified Contract Service Provider (Level 3, or manufacturer-authorized waiver) with results within 30 days, and semiannual effluent tests for packed bed media. Late fee doubles/triples/quadruples the permit fee at 30/60/90 days; after 90 days the department inspects and bills the owner. Operating permit requires a name change at sale, recorded on the deed (no inspection at sale). Fee amounts not read (fee schedule page empty in fetch). Text read by OCR of the scanned regulation.
Effective date
2013-11-26

Model catalog of installed septic hardware, and septic rules, permitting authorities and licensed providers by state and county. Every fact links to its source. Manufacturer photos are linked, not copied.