Weber County, Utah
Who permits septic systems here
Weber-Morgan Health Department, Environmental Health Division, Water Quality Bureau
Health district
- 477 23rd Street, Ogden, UT 84401
- Phone: 801-399-7160
- Septic permit page
Local rules
These add to the state rule on the Utah page.
- Administering body
- Weber-Morgan Health Department under its Onsite Wastewater Treatment Systems Regulation (amending R317-4 for Weber and Morgan counties)
- Administration model
- State rule, local agencies permit
- Rule
- Weber-Morgan Onsite Wastewater Treatment Systems Regulation (adopted 2013-11-25), sec. 1.4.B.1, 1.5.B.4.b
- Maintenance contract for aerobic or advanced units
- Yes, for the life of the system
Weber-Morgan Onsite Regulation 1.4.B.1.f: “Operating permits will only be issued to an individual. The individual must demonstrate ownership of the property, and will be responsible to maintain contracts with a contract service provider, and keep operating permits current” source
- Reports go to the authority
- Yes
Weber-Morgan Onsite Regulation 1.4.B.1.e.i: “The system has been inspected as required by R317-4 Table 7, by a contract service provider, and inspection results have been submitted to the Department within 30 days of completed inspection.” source
- Inspection at sale
- None
Weber-Morgan Onsite Regulation 1.4.B.1.g: “Operating permits will require a name change for any change of ownership of the property required to have a renewable operating permit. This requirement will be recorded on the deed of ownership, and changes made at time of sale.” source
- Annual operating permit
- Yes
Weber-Morgan Onsite Regulation 1.4.B.1.a: “Operating permits will be issued after final construction approval and shall be renewed annually.” source
- Fees and periodic programs
- Mound, packed bed media and pressure distribution systems need an annually renewed operating permit; renewal requires inspection per R317-4 Table 7 by a department-certified Contract Service Provider (Level 3, or manufacturer-authorized waiver) with results within 30 days, and semiannual effluent tests for packed bed media. Late fee doubles/triples/quadruples the permit fee at 30/60/90 days; after 90 days the department inspects and bills the owner. Operating permit requires a name change at sale, recorded on the deed (no inspection at sale). Fee amounts not read (fee schedule page empty in fetch). Text read by OCR of the scanned regulation.
- Effective date
- 2013-11-26
Systems in service (estimates)
| Year | What | Low | Mid | High | Method | |
|---|---|---|---|---|---|---|
| 2021 | All systems | 8,570 | 9,571 | 11,527 | USGS estimate (2025) | source |
Pumps and aerators
Estimated systems in Weber County with an aerobic treatment unit (aerator), an effluent or dosing pump, or either. How these are estimated
- With an aerator
- 190
- 42 to 530 · 2% of all systems
- With a pump
- 1,100
- 450 to 2,500 · 11% of all systems
- Pump or aerator
- 1,100
- 460 to 2,700 · 12% of all systems
Assumption State: AssumptionNo county figure: the state's estimate is spread by the county's share of the state's systems.