Town of New London Health Officer

Type
Town
Area served
Town of New London (town-wide), Merrimack County
Address
375 Main Street, New London, NH 03257 (town office)
Phone
(603) 526-4821 (town office)
Counties
Merrimack County (partial)
Source: https://newlondon.nh.gov/septic, retrieved 2026-10-31

Town health officer enforces a local septic ordinance/health regulation in addition to NHDES approvals (state approves designs and operation statewide). Septic Health Regulation approved 12-19-2024, effective 2026-01-01: town-wide pumping and general inspection every three years with receipt and report to the Health Officer; Health Officer keeps a list of approved ITA systems, which follow manufacturer pump/inspect/maintain frequency.

Local rules

Administering body
New London Health Officer with Board of Selectmen
Administration model
State agency permits directly
Statute
RSA 147:10; RSA 147:1
Rule
New London Septic Health Regulation (approved 12-19-2024)
Maintenance contract for aerobic or advanced units
Not stated

New London Septic Health Regulation, Innovative/Alternate Technology (ITA) Systems: “The Health Officer shall maintain a list of approved proprietary Innovative/Alternative Technology (ITA) septic systems ... Such systems shall be pumped out, inspected and maintained at a frequency specified by the ITA manufacturer.” source

Reports go to the authority
Yes

New London Septic Health Regulation, Septic Tank Pumping and General Inspection: “All developed properties with Individual Sewage Disposal Systems in the Town of New London shall be pumped a minimum of once every three (3) years. A copy of the receipt for pumping and the general inspection report shall be submitted to the Town of New London Health Officer or designee.” source

Report channel
Not stated
Inspection at sale
None

New London Septic Health Regulation, Transfer of property: “Upon the transfer of a property, the new owner shall provide their contact information to the Health Officer (or the designated office) to ensure the continuation of automated septic permit renewal notices.” source

What triggers it
On transfer the new owner only provides contact information to the Health Officer
Fees and periodic programs
Town-wide pumping and general inspection every 3 years, receipt and report to the Health Officer; waiver for low use (never beyond 6 years; none for commercial or rentals). ITA systems pumped/inspected/maintained at manufacturer frequency; Health Officer keeps an approved ITA list and may request manufacturers' inspection records. Grease traps at least twice a year; holding tanks inspected every 3 years.
Effective date
2026-01-01

Model catalog of installed septic hardware, and septic rules, permitting authorities and licensed providers by state and county. Every fact links to its source. Manufacturer photos are linked, not copied.