New Hampshire septic rules

New Hampshire Department of Environmental Services (NHDES), Subsurface Systems Bureau · Subsurface Systems (septic) program. Statute: RSA 485-A:29 to 485-A:44 (485-A:35 designer/installer permits; 485-A:39 waterfront transfer evaluation); RSA 477:4-c (seller disclosure). Rule: Env-Wq 1000 Subdivisions; Individual Sewage Disposal Systems (readopted #14486, eff. 2026-02-01).

For homeowners in New Hampshire

  • New Hampshire Department of Environmental Services (NHDES), Subsurface Systems Bureau issues septic permits directly. Find yours in the county list below.
  • A maintenance contract is required for aerobic units (the rule does not state a term).
  • Homeowners may not maintain their own aerobic unit; a licensed provider must.
  • Selling a home triggers a septic inspection statewide.

Counties

The office that permits septic systems in each county, with the estimated number of systems and how many have an aerator or a pump. ● marks counties whose pump and aerator figures come from county records; the rest spread the state estimate.

What the state rule requires

Administering body
NHDES Subsurface Systems Bureau issues the Approval for Construction and Approval for Operation for every ISDS and permits designers and installers; some municipalities require local approval first (Communities Requiring Local Approval list); local health officers enforce

NHDES Septic Systems page: “After we (and if required, your local municipality) approve your proposed plans, we issue you an Approval for Septic System Construction. Before you use your septic system, you need both an Approval for Construction and an Approval for Operation. Plans for proposed septic systems must be designed, prepared and submitted by a permitted New Hampshire septic system designer.” source

Administration model
State agency permits directly
Statute
RSA 485-A:29-44
Rule
Env-Wq 1000
License required
Yes

RSA 485-A:35, 36; NHDES Septic Designer and Installer page: “Applications for individual sewage disposal systems or septic systems must be prepared by a permitted designer. With the exception for homeowners installing for their primary domicile, septic systems must be constructed by a permitted installer. Installer and designer permits are valid for two years; six credit hours of continuing education per renewal period.” source

License classes
designer;installer;inspector_pos

RSA 485-A:35; RSA 485-A:39: “NHDES issues ISDS designer permits to individuals that demonstrate a sound working knowledge ... RSA 485-A:39: the buyer shall engage a New Hampshire licensed septic system evaluator to conduct a septic system evaluation (evaluators licensed under a separate board, not NHDES).” source

Maintenance contract for aerobic or advanced units
Yes (term not stated)

Env-Wq 1024.03(b); Env-Wq 1011.02: “If the manufacturer's specifications or the operational manual for the proposed innovative or alternative technology states that the technology requires ongoing professional maintenance to operate properly, the owner of a proposed ISDS which incorporates that technology shall execute and submit to the department with the ISDS application a service contract with the ITA owner, or with a person or company that has been pre-qualified and trained by the ITA owner, to perform such inspections and maintenance before construction approval is granted. 1011.02: The department shall not give approval to operate for an ISDS having one or more aeration tanks unless the applicant provides a copy of an executed service contract for the continued maintenance of the aeration tank(s) by a qualified service technician.” source

Homeowner self-maintenance
Not allowed

Env-Wq 1024.03(b): “a service contract with the ITA owner, or with a person or company that has been pre-qualified and trained by the ITA owner” source

Self-maintenance conditions
Service contract must be with the ITA owner (technology vendor) or a person or company pre-qualified and trained by the ITA owner (Env-Wq 1024.03(b)); aeration tanks need a service contract with a qualified service technician (Env-Wq 1011.02)
Reports go to the authority
Yes

Env-Wq 1024.03(d): “All ITA owners shall submit ... by March 31, 2027 and annually thereafter: for each ITA that requires a maintenance contract, a list of each ISDS which has a maintenance contract and the addresses, the approval to operate number, and a letter certifying which of the systems from the list have been maintained per the maintenance agreement, or the reasons why they have not been maintained.” source

Report channel
Not stated
Electronic monitoring in the rule
None found

Env-Wq 1000: “Only piezometric monitoring wells (Env-Wq 1010) mention monitoring; no telemetry, remote or alarm provision.” source

Monitoring wording
Env-Wq 1000 (eff. 2026-02-01) searched for telemetry, remote, electronic, alarm, monitor: only groundwater monitoring wells (Env-Wq 1010) found; no electronic or remote monitoring provision for treatment systems.
Inspection at sale
Required statewide

RSA 485-A:39: “Prior to the transfer of any developed waterfront property using a septic system, where any portion of the septic system is within 250 feet of the reference line as defined in RSA 483-B:4, XVII, the buyer of the property shall, at the buyer's expense, engage a New Hampshire licensed septic system evaluator to conduct a septic system evaluation. However, the buyer may accept an evaluation prepared for the seller of the property if the evaluation was completed within 180 days of the date of property transfer.” source

What triggers it
Developed waterfront property only: before transfer of property with any part of the septic system within 250 feet of the reference line (RSA 483-B), the buyer must obtain a septic system evaluation by a NH licensed septic system evaluator (seller's evaluation accepted if within 180 days); systems not approved or approved before Sept 1, 1989 also need a permitted designer's failure determination; failed systems replaced within 180 days of transfer (RSA 485-A:39, as amended eff. 2024-09-01)
Who inspects
Point-of-sale inspector

RSA 485-A:39 I, V: “If the New Hampshire licensed septic system evaluator, utilizing board-approved standards of practice, determines that the septic system shows signs of failure ... the buyer shall replace the system within 180 days of the transfer of the property.” source

Seller disclosure covers septic
Yes

RSA 477:4-c: “Disclosure Required; Water Supply; Sewage Disposal ... (b) Information relative to the sewage disposal system including the size of the tank, type of system, its location, malfunctions, the age of the system, the date it was most recently serviced, and the name of the contractor who services the system.” source

Approved product list
https://www.des.nh.gov/sites/g/files/ehbemt341/files/documents/innovative-tech-approvals.pdf

Env-Wq 1024; NHDES innovative-tech-approvals.pdf: “Innovative/alternative technology approvals issued under Env-Wq 1024 (provisional and general ITAs); PDF linked from NHDES site search.” source

Provider list
https://onestop.des.nh.gov/ords/r/apex_whs/ssbonestop/home

NHDES Septic Systems page: “Our online Subsurface Onestop portal provides access to septic system records from 1967-1986 and 2016-present. You can search by property owner name, address, designer, installer or approval number. Records from 1986-2016 are currently being digitized.” source

Effective date
2026-02-01

Systems in service

YearWhatLowMidHighMethod
1990All systems246,692246,692246,6921990 censussource
2021All systems249,084280,747314,479USGS estimate (2025)source

Pumps and aerators

Estimated systems in New Hampshire with an aerobic treatment unit (aerator), an effluent or dosing pump, or either. How these are estimated

With an aerator
2,800
750 to 9,400 · 1% of all systems
With a pump
58,000
25,000 to 120,000 · 21% of all systems
Pump or aerator
59,000
26,000 to 120,000 · 21% of all systems

Control panels: about 59,000 installed (22,000 to 130,000), about 580 new a year and 3,900 replacements a year. How panels are estimated

AssumptionNo state figure was found; a regional assumption with a wide range.

No count found. Northeast prior: elevated sand mounds and pressure systems common (PA, NY); advanced units mostly in nitrogen-sensitive areas.

Licensed professionals

No roster parsed yet. The state's list: https://onestop.des.nh.gov/ords/r/apex_whs/ssbonestop/home

Sources

Model catalog of installed septic hardware, and septic rules, permitting authorities and licensed providers by state and county. Every fact links to its source. Manufacturer photos are linked, not copied.