NHDES Land Resources Management, Subsurface Systems Bureau
- Type
- State agency
- Area served
- Statewide: approves every individual sewage disposal system design (Approval for Construction) and Approval for Operation
- Phone
- (603) 271-3501
- Permit platform
- NHDES ePermitting; Subsurface OneStop (records 1967-1986 and 2016-present)
- Website
- https://www.des.nh.gov/
- Septic page
- https://www.des.nh.gov/land/septic-systems
- Counties
- Belknap County, Carroll County, Cheshire County, Coos County, Grafton County, Hillsborough County, Merrimack County, Rockingham County, Strafford County, Sullivan County
Plans must be prepared by a permitted NH designer; where required the municipality approves first. NHDES list 'Communities That Require Local Approval Prior To RSA 485-A:32, I & II' (revised 5/14/2026) names about 120 towns, incl. Albany, Amherst, Bedford, Bow, Conway, Dover, Exeter, Hanover, Hollis, Hudson, Manchester, Meredith, Nashua, New London, Newbury, Pelham, Rochester, Salem, Windham, Wolfeboro (Sunapee and Northwood are not on it); recent changes: Franconia removed 3/31/2026, Moultonborough removed 9/30/2025, Sanbornton added 10/23/23, Alton removed 10/16/23, New Durham added 3/31/2023. Revised rules Env-Wq 1000 effective 2026-02-01. Regional field inspector map at ssb-regions.pdf (not read). des.nh.gov blocks scripted fetches; pages read in a browser.