County of San Diego Department of Environmental Health and Quality (DEHQ), Land and Water Quality Division, Land Use Program
- Type
- County
- Area served
- San Diego County (unincorporated area and cities that rely on DEHQ for OWTS)
- Address
- 5500 Overland Avenue, Suite 110, San Diego, CA 92123 (OWTS customer counter since 2025-12-01)
- Phone
- 858-565-5173 (duty desk); 858-694-2553 (septic inspection line)
- Permit platform
- Accela Citizen Access (publicservices.sandiegocounty.gov/CitizenAccess) for online payment
- Provider list
- https://www.sandiegocounty.gov/content/dam/sdc/deh/lwqd/Qualified_Service_Provider_List.pdf
- Counties
- San Diego County
Also publishes a Qualified Professional (OWTS designer) list (/content/dam/sdc/deh/lwqd/OWTS_Professional_List.pdf) and a Septic Contractor List (/content/dam/sdc/deh/lwqd/septiccontractorlist.pdf); sewage hauler permits issued by DEHQ. County Code: Onsite Wastewater System Ordinance (Regulatory Code 68.3xx). DEHQ held 2025 workshops on revising the Annual Operating Permit program for Supplemental Treatment Systems.
Local rules
- Administering body
- San Diego County DEHQ under its 2025 LAMP (Tier 2)
- Administration model
- State rule, local agencies permit
- Rule
- San Diego County LAMP (eff. 2025-02-01) ch. 9; Regulatory Code 68.335
- Maintenance contract for aerobic or advanced units
- Yes, for the life of the system
SD LAMP 9.3.3: “The owner is responsible to ensure that the supplemental treatment system is maintained by a qualified service provider and a maintenance contract must be in effect at all times.” source
- Contract for the life of the system
- Yes
- Homeowner self-maintenance
- Not allowed
- Self-maintenance conditions
- Supplemental treatment systems maintained by a qualified service provider trained/certified for the system; maintenance contract in effect at all times
- Service visits per year
- 2
SD LAMP 9.3.4: “All supplemental treatment systems require, at a minimum, biannual inspections by the qualified service provider ... copies of the inspection results are provided to the DEHQ within 30 days.” source
- Reports go to the authority
- Yes
- Report channel
- Not stated
- Report platform
- Owner provides copies of QSP inspection results to DEHQ within 30 days
- Electronic monitoring in the rule
- Required for some systems
SD LAMP 9.2.9: “equipped with a visual and audible alarm as well as a telemetric alarm that alerts the owner, the qualified service provider, and DEHQ of system malfunctions.” source
- Monitoring wording
- 9.2.9: The supplemental treatment system shall be equipped with a visual and audible alarm as well as a telemetric alarm that alerts the owner, the qualified service provider, and DEHQ of system malfunctions. The telemetric alarm requirement shall not apply to cases where it is demonstrated that a telemetric alarm is impracticable.
- Alarm required
- Yes
- Inspection at sale
- None
- Annual operating permit
- Yes
SD LAMP 9.3.1: “All supplemental treatment systems require an annual operating permit issued by DEHQ.” source
- Fees and periodic programs
- Annual Operating Permit for every supplemental treatment system (9.3.1); program options under review in 2025 workshops; fees per DEHQ fiscal-year fee schedule
- Provider list
- https://www.sandiegocounty.gov/content/dam/sdc/deh/lwqd/Qualified_Service_Provider_List.pdf