San Diego County, California

Who permits septic systems here

County of San Diego Department of Environmental Health and Quality (DEHQ), Land and Water Quality Division, Land Use Program

County

Local rules

These add to the state rule on the California page.

Administering body
San Diego County DEHQ under its 2025 LAMP (Tier 2)
Administration model
State rule, local agencies permit
Rule
San Diego County LAMP (eff. 2025-02-01) ch. 9; Regulatory Code 68.335
Maintenance contract for aerobic or advanced units
Yes, for the life of the system

SD LAMP 9.3.3: “The owner is responsible to ensure that the supplemental treatment system is maintained by a qualified service provider and a maintenance contract must be in effect at all times.” source

Contract for the life of the system
Yes
Homeowner self-maintenance
Not allowed
Self-maintenance conditions
Supplemental treatment systems maintained by a qualified service provider trained/certified for the system; maintenance contract in effect at all times
Service visits per year
2

SD LAMP 9.3.4: “All supplemental treatment systems require, at a minimum, biannual inspections by the qualified service provider ... copies of the inspection results are provided to the DEHQ within 30 days.” source

Reports go to the authority
Yes
Report channel
Not stated
Report platform
Owner provides copies of QSP inspection results to DEHQ within 30 days
Electronic monitoring in the rule
Required for some systems

SD LAMP 9.2.9: “equipped with a visual and audible alarm as well as a telemetric alarm that alerts the owner, the qualified service provider, and DEHQ of system malfunctions.” source

Monitoring wording
9.2.9: The supplemental treatment system shall be equipped with a visual and audible alarm as well as a telemetric alarm that alerts the owner, the qualified service provider, and DEHQ of system malfunctions. The telemetric alarm requirement shall not apply to cases where it is demonstrated that a telemetric alarm is impracticable.
Alarm required
Yes
Inspection at sale
None
Annual operating permit
Yes

SD LAMP 9.3.1: “All supplemental treatment systems require an annual operating permit issued by DEHQ.” source

Fees and periodic programs
Annual Operating Permit for every supplemental treatment system (9.3.1); program options under review in 2025 workshops; fees per DEHQ fiscal-year fee schedule

Systems in service (estimates)

YearWhatLowMidHighMethod
2021All systems51,43960,62468,447USGS estimate (2025)source

Pumps and aerators

Estimated systems in San Diego County with an aerobic treatment unit (aerator), an effluent or dosing pump, or either. How these are estimated

With an aerator
1,200
270 to 3,500 · 2% of all systems
With a pump
6,800
2,800 to 16,000 · 11% of all systems
Pump or aerator
7,300
2,900 to 17,000 · 12% of all systems

Assumption State: AssumptionNo county figure: the state's estimate is spread by the county's share of the state's systems.

Model catalog of installed septic hardware, and septic rules, permitting authorities and licensed providers by state and county. Every fact links to its source. Manufacturer photos are linked, not copied.