Brown County, Wisconsin
Who permits septic systems here
Brown County Planning and Land Services, Zoning Division
County
- Northern Building, Room 320, 305 E. Walnut Street, Green Bay, WI 54301 (mail: P.O. Box 23600, Green Bay, WI 54305-3600)
- Phone: 920-448-6480
- Email: Matt.Heyroth@browncountywi.gov
- Septic permit page
- Approved provider list
Local rules
These add to the state rule on the Wisconsin page.
- Administering body
- Brown County Planning and Land Services, Zoning Office
- Rule
- Brown County Code ch. 11 Private On-Site Wastewater Treatment System Ordinance (revised 2026-02-18), 11.073(3),(5); 11.075(3); 11.17
- Maintenance contract for aerobic or advanced units
- Yes (term not stated)
Brown County Code 11.075(3): “A Maintenance Contract furnished by the Zoning Office must be submitted prior to issuance of a sanitary permit that includes: (a) The signature of the owner and contracted POWTS Maintainer.” source
- Reports go to the authority
- Yes
- Report channel
- Online portal
Brown County Code 11.073(3), (5)(a): “It is the responsibility of the licensed pumper to submit the pumping reports to the county within 30 calendar days ... using the online system provided by Brown County.” source
- Report platform
- Licensed pumper submits pumping reports within 30 days using the online system provided by Brown County (11.073(3), (5)(a))
- Inspection at sale
- Required by local ordinance
Brown County Code 11.17(1): “An existing system inspection is required for all property transfers and land divisions in which the property contains a structure served by a POWTS.” source
- What triggers it
- Ordinance text requires an existing system inspection for all property transfers and land divisions where a structure is served by a POWTS: observation boring by a certified soil tester 3 ft below the absorption area plus a written evaluation of baffles, vents, alarms, tanks, absorption area, outfalls, setbacks and surface discharge; report on county forms within 30 days; county may verify at owner cost and order corrections; systems already on the mandatory maintenance program may be excused at the Zoning Administrator's discretion; not required where the municipality sets a sewer connection date (11.17). Wis. Stat. 706.22 (2015) bars local time-of-sale requirements, so enforceability is unverified.
- Who inspects
- Inspector
Brown County Code 11.17(2)(b): “A written evaluation of the general condition of the POWTS, by a Master Plumber, Master Plumber-Restricted Service, POWTS Inspector, or Certified Soil Tester” source
- Annual fee (USD)
- 16
Brown County Zoning fee schedule (eff. 2018-01-01): “Sanitary maintenance program annual fee 16.00” source
- Fees and periodic programs
- Sanitary maintenance program annual fee $16; existing system inspection $400; sanitary permit transfer fee $60 (fee schedule effective 2018-01-01). Treatment tanks pumped by a licensed pumper at least every 3 years; county mails notices (11.073(5)). Alternate/experimental systems (<36 in. separation) need a Zoning Office maintenance contract signed by the owner and a POWTS maintainer before permit issuance (11.075(3)).
- Effective date
- 2026-02-18
Systems in service (estimates)
| Year | What | Low | Mid | High | Method | |
|---|---|---|---|---|---|---|
| 2021 | All systems | 17,052 | 20,482 | 28,292 | USGS estimate (2025) | source |
Pumps and aerators
Estimated systems in Brown County with an aerobic treatment unit (aerator), an effluent or dosing pump, or either. How these are estimated
- With an aerator
- 41
- 33 to 49 · 0% of all systems
- With a pump
- 9,100
- 7,300 to 11,000 · 45% of all systems
- Pump or aerator
- 9,100
- 7,300 to 11,000 · 45% of all systems
County evidenceThis county's own records or a published county count.
Brown County POWTS layer, 12,662 systems: mounds 41.2%, at-grade 2.8%, in-ground pressure 0.4%; no aerobic units mapped (state assumption used).