Vermont septic rules

Vermont Department of Environmental Conservation (DEC), Drinking Water and Groundwater Protection Division, Wastewater System and Potable Water Supply Program · Wastewater System and Potable Water Supply (WW) Program. Statute: 10 V.S.A. chapter 64 (also chapters 47 and 56; 10 V.S.A. 901, 905b, 1390, 6616). Rule: Environmental Protection Rules, Chapter 1: Wastewater System and Potable Water Supply Rules (effective 2023-11-06 with 2024 corrections; DEC lists a further version effective 2026-01-01).

For homeowners in Vermont

  • Vermont Department of Environmental Conservation (DEC), Drinking Water and Groundwater Protection Division, Wastewater System and Potable Water Supply Program issues septic permits directly. Find yours in the county list below.
  • The state rule is silent on maintenance contracts for aerobic units; 1 service visits a year.
  • Homeowners may not maintain their own aerobic unit; a licensed provider must.

Counties

The office that permits septic systems in each county, with the estimated number of systems and how many have an aerator or a pump. ● marks counties whose pump and aerator figures come from county records; the rest spread the state estimate.

CountyPermitting authorityPhoneSystems (USGS mid)With an aeratorPump or aeratorLocal rules
Addison CountyDEC Rutland (North) Regional Office (Wastewater System and Potable Water Supply Program)802-786-5900 (fax 802-786-5915)12,7791282,684
Bennington CountyDEC Rutland (North) Regional Office (Wastewater System and Potable Water Supply Program)802-786-5900 (fax 802-786-5915)14,4301443,030
Caledonia CountyDEC St. Johnsbury Regional Office (Wastewater System and Potable Water Supply Program)802-751-0130 (fax 802-748-6687)12,4711252,619
Chittenden CountyDEC Rutland (North) Regional Office (Wastewater System and Potable Water Supply Program)802-786-5900 (fax 802-786-5915)19,6911974,135
Essex CountyDEC St. Johnsbury Regional Office (Wastewater System and Potable Water Supply Program)802-751-0130 (fax 802-748-6687)4,35444914
Franklin CountyDEC Essex Regional Office (Wastewater System and Potable Water Supply Program)802-751-0130 (fax 802-879-3871)15,3841543,231
Grand Isle CountyDEC Essex Regional Office (Wastewater System and Potable Water Supply Program)802-751-0130 (fax 802-879-3871)4,62546971
Lamoille CountyDEC Montpelier Regional Office (Wastewater System and Potable Water Supply Program)802-828-503410,4101042,186
Orange CountyDEC Montpelier Regional Office (Wastewater System and Potable Water Supply Program)802-828-503413,3691342,807
Orleans CountyDEC St. Johnsbury Regional Office (Wastewater System and Potable Water Supply Program)802-751-0130 (fax 802-748-6687)13,0601312,743
Rutland CountyDEC Rutland (North) Regional Office (Wastewater System and Potable Water Supply Program)802-786-5900 (fax 802-786-5915)21,6362164,544
Washington CountyDEC Montpelier Regional Office (Wastewater System and Potable Water Supply Program)802-828-503418,4931853,884
Windham CountyDEC Springfield Regional Office (Wastewater System and Potable Water Supply Program)802-522-222019,2461924,042
Windsor CountyDEC Springfield Regional Office (Wastewater System and Potable Water Supply Program)802-522-222023,2142324,875

What the state rule requires

Administering body
DEC Wastewater System and Potable Water Supply Program permits systems under 6,500 gpd statewide through five regional offices (Montpelier, Essex, Rutland, Springfield, St. Johnsbury), licenses designers and approves innovative/alternative (I/A) technology; some municipalities hold delegation (Municipal Delegation page); designs and installation certifications by state-licensed designers

DEC WW Program page: “Permitting staff are located in five regional offices through out the State. Staff also administer the licensed designer program and reviews innovative and alternative systems for potential use in the state.” source

Administration model
State agency permits directly
Statute
10 V.S.A. chapter 64

Rules § 1-102(a): “These Rules are adopted by the Secretary under the authority of the Secretary granted by 10 V.S.A., Chapters 47, 56, and 64, and 10 V.S.A. §§ 901, 905b, 1390, 6616.” source

Rule
Wastewater System and Potable Water Supply Rules (Env. Protection Rules ch. 1), eff. 2023-11-06
License required
Yes

Rules § 1-103 definition (50) and § 1-311: “Installer - means a person who constructs a potable water supply or wastewater system serving or intended to serve a building or structure, or campground. ... a designer or, when allowed by these Rules, an installer completes an installation certification for the potable water supply or wastewater system that complies with § 1-311.” source

License classes
designer;engineer_pe

DEC Licensed Designers page; Rules Subchapter 7: “There are four classes of Designers licensed to design wastewater systems and potable water supplies: Class 1 Designer is a professional engineer ... Class BW ... Class B Designer is licensed to design wastewater systems that may require site modifications or the use of general approved innovative and alternative products ... Class A Designer is licensed to design wastewater systems that do not require site modifications ... limited to a design flow of 1350 gallons per day or less.” source

Maintenance contract for aerobic or advanced units
Not stated

Rules § 1-402 to 1-405 (I/A approval contents): “Maintenance requirements: (A) Technical qualifications for service providers. (B) Specific actions and their frequency required to maintain the system or component. (C) Information that will be provided to owner of the system or component.” source

Homeowner self-maintenance
Not allowed

Rules, I/A inspection provision; DEC I/A page: “the inspection may be completed by: (1) a manufacturer-approved service provider; or (2) if the manufacturer is no longer in business in Vermont: (A) a designer; or (B) a person authorized by the Secretary ... Beginning January 1, 2014 the State of Vermont will allow previously issued permit holders to utilize vendor-approved service providers to oversee the inspections.” source

Self-maintenance conditions
I/A system inspections must be completed by a manufacturer-approved service provider, or by a designer or Secretary-authorized person if the manufacturer leaves Vermont (Rules I/A inspection provision); permit conditions carry the inspection/maintenance requirements and reports are filed by the service provider
Service visits per year
1

DEC I/A page: “prior to January 1, 2014 I/A permits with annual inspection and maintenance requirements required that a vendor-approved licensed designer or professional engineer oversee the inspections and maintenance.” source

Reports go to the authority
Yes

DEC I/A page: “Permit conditions for Innovative Alternative Technology require that owners comply with the reporting and inspection/maintenance requirements outlined in their Permit and I/A Approval. The Reports must be submitted to the WW Program. All Inspection Reports for Innovative/Alternative technologies must be submitted by the Service Provider through ANROnline.” source

Report channel
Online portal
Report platform
ANR Online (I/A field inspection reports submitted by the service provider to the WW Program)
Electronic monitoring in the rule
Alarm requirement only

Rules, pump/dosing requirements: “(2) have an adjustable timer to control the pump run/rest times/dose volume; (3) have an alarm float; (4) have a cycle counter; and (5) have the following additional floats: (A) a redundant off float.” source

Monitoring wording
Timed-dose pump systems must have an adjustable timer, an alarm float, a cycle counter and a redundant off float (Rules, pump/dosing design requirements). No telemetry or remote-monitoring provision found; 'remote' appears only for remote campsites and web access to records.
Alarm required
Yes
Fees and periodic programs
Regional office permit fee schedule effective 2026-07-01 linked from the program page; I/A approvals require manufacturer annual reports and periodic renewal
Approved product list
https://dec.vermont.gov/water/programs/ww-systems/innovative-alternative/approved-systems

DEC Innovative and Alternative Approved Wastewater Technology page: “I/A Treatment Technology Approvals for General Use with Low Strength Wastewater Effluent: Approval Number, Approval, Approval Expires, Distributors, Service Providers (e.g. 2001-01-R14 AdvanTex AX and AX-Max textile treatment, expires May 1, 2028).” source

Effective date
2023-11-06

Systems in service

YearWhatLowMidHighMethod
1990All systems149,125149,125149,1251990 censussource
2021All systems196,016203,162209,151USGS estimate (2025)source

Pumps and aerators

Estimated systems in Vermont with an aerobic treatment unit (aerator), an effluent or dosing pump, or either. How these are estimated

With an aerator
2,000
590 to 6,300 · 1% of all systems
With a pump
42,000
20,000 to 77,000 · 21% of all systems
Pump or aerator
43,000
20,000 to 79,000 · 21% of all systems

Control panels: about 43,000 installed (17,000 to 87,000), about 420 new a year and 2,800 replacements a year. How panels are estimated

AssumptionNo state figure was found; a regional assumption with a wide range.

No count found. Northeast prior: elevated sand mounds and pressure systems common (PA, NY); advanced units mostly in nitrogen-sensitive areas.

Licensed professionals

No roster parsed yet. The state's list: https://dec.vermont.gov/water/licensed-designers

Sources

Model catalog of installed septic hardware, and septic rules, permitting authorities and licensed providers by state and county. Every fact links to its source. Manufacturer photos are linked, not copied.