Tennessee septic rules
Tennessee Department of Environment and Conservation (TDEC), Division of Water Resources, Land Based Systems Unit · Subsurface Sewage Disposal System (SSDS) Program. Statute: T.C.A. 68-221-401 et seq.. Rule: Tenn. Comp. R. & Regs. 0400-48-01.
For homeowners in Tennessee
- Depending on the county, either the state agency or a local agency permits septic systems. Find yours in the county list below.
- Aerobic and advanced treatment units must stay under a maintenance contract for as long as the system is in use; 4 service visits a year.
- Homeowners may not maintain their own aerobic unit; a licensed provider must.
- No statewide septic inspection is required when a home is sold.
- Electronic monitoring or telemetry is required for some systems.
Counties
The office that permits septic systems in each county, with the estimated number of systems and how many have an aerator or a pump. ● marks counties whose pump and aerator figures come from county records; the rest spread the state estimate.
What the state rule requires
- Administering body
- TDEC Division of Water Resources (Environmental Field Offices) issues SSDS construction permits, installer and pumper permits and approves soil consultants and maintenance providers statewide; nine contract counties (Blount, Davidson, Hamilton, Jefferson, Knox, Madison, Sevier, Shelby, Williamson) run their own septic assistance programs under contract and may require an additional local permit
TDEC SSDS construction permit page: “Completed application forms and application fees should be sent to the Division of Water Resources at the appropriate Environmental Field Office ... contract counties (Blount, Davidson, Hamilton, Jefferson, Knox, Madison, Sevier, Shelby & Williamson) may require an additional permit.” source
- Administration model
- Mixed: state offices and local agencies
- Statute
- T.C.A. 68-221-401 et seq.
- Rule
- Tenn. Comp. R. & Regs. 0400-48-01
- License required
- Yes
0400-48-01-.19(1)(a): “No person shall engage in the business of constructing, installing, altering or extending or repairing a subsurface sewage disposal system unless he has a valid annual permit issued by the Commissioner. This rule does not apply to the property owner or the property owner's tenant doing his own work on his own property where such property is the residence of the owner or tenant.” source
- License classes
- installer;installer_advanced;pumper;maintenance_provider;site_evaluator
0400-48-01-.19, .20, .23, .18; TDEC installer/pumper permits page: “Installer $200 CONVENTIONAL SUBSURFACE SEWAGE DISPOSAL SYSTEMS INSTALLER PERMIT ... $100 ALTERNATIVE ... Additional fee for each type of alternative system (LPP, mound, oxidation lagoon, ATS/SSD). Pumping $200 SEPTIC TANK PUMPING CONTRACTOR PERMIT. Rule .23: approved maintenance provider for ATS, SDD or packaged systems; Rule .18: approved soil consultants.” source
- Maintenance contract for aerobic or advanced units
- Yes, for the life of the system
0400-48-01-.10(2)(b)3 and (2)(c)3: “The manufacturer shall execute a four (4) year operation and maintenance contract with the owner of each ATS sold and installed. The costs of such contract shall be included in the original price of the installed ATS. ... The property owner at the time of initial installation of the ATS and any subsequent owner, for the life of the system, shall have in effect a contract for operation and maintenance of the ATS with an approved maintenance provider under Rule 0400-48-01-.23. These contracts will be reviewed by this department on an annual basis. Failure of a property owner to maintain such a contract will be considered a Class C misdemeanor.” source
- Initial contract (years)
- 4
0400-48-01-.10(2)(b)3: “The manufacturer shall execute a four (4) year operation and maintenance contract with the owner of each ATS sold and installed.” source
- Contract for the life of the system
- Yes
0400-48-01-.10(2)(b)1, (2)(c)2-3: “Once an ATS is installed pursuant to this section, the owner of the property shall perpetually operate and maintain it properly. This requirement shall run with the land and be binding upon all future owners of the property. ... A deed restriction must be recorded with the deed of the property providing notification to all future owners that the property is served by an ATS.” source
- Homeowner self-maintenance
- Not allowed
0400-48-01-.10(2)(b)1; .23(10)(f): “A maintenance provider approved by this department in accordance with Rule 0400-48-01-.23 shall perform this operation and maintenance on the ATS. ... Operation and maintenance visits shall be conducted by the approved maintenance provider.” source
- Self-maintenance conditions
- Rule 0400-48-01-.10(2)(b)1: a maintenance provider approved under .23 shall perform ATS operation and maintenance; owner must perpetually maintain a contract (.10(2)(c)3)
- Service visits per year
- 4
0400-48-01-.10(2)(b)2: “Routine operation and maintenance shall be performed at three-month intervals. However, the frequency of system visits may be adjusted by the Commissioner depending upon the ATS's complexity, system performance and manufacturer's recommendations.” source
- Reports go to the authority
- Yes
0400-48-01-.23(10)(a),(c),(e): “Any maintenance provider ... shall be responsible to provide proof of the operation and maintenance agreement ... and paying the appropriate tracking fee for each ATS, SDD, or packaged system ... due on the anniversary of the certificate of completion. ... In the event that a property owner chooses not to renew or cancels an operation and maintenance contract ... the maintenance provider shall notify the Department within 30 days. ... Maintenance providers shall be responsible for notifying this Department of any condition, event, or failure ... outside the parameters of routine operation.” source
- Report channel
- Not stated
- Report platform
- NSF web-based onsite monitoring program required for every ATS (.10(2)(c)4); maintenance provider files proof of contract and tracking fee annually; installer/pumper permits via MyTDEC Forms
- Electronic monitoring in the rule
- Required for some systems
0400-48-01-.10(2)(c)4: “Any ATS permitted for installation shall be properly equipped to participate in NSF's web-based onsite monitoring program, or such other program deemed by the Department to be substantially similar, to assure that the system is maintained in perpetuity. The manufacturer shall provide the necessary equipment and include the cost for participation for the first four years in the price of the ATS after which time the maintenance provider contracted to operate and maintain the system will be responsible for participation.” source
- Monitoring wording
- Any ATS permitted for installation shall be properly equipped to participate in NSF's web-based onsite monitoring program ... for the life of the system (.10(2)(c)4). All ATS shall incorporate appropriate sensors and telemetric alarms that are capable of immediately notifying the maintenance provider and this Department of a critical malfunction (.10(2)(c)7).
- Alarm required
- Yes
0400-48-01-.10(2)(c)7: “All ATS shall incorporate appropriate sensors and telemetric alarms that are capable of immediately notifying the maintenance provider and this Department of a critical malfunction as determined by the Commissioner.” source
- Inspection at sale
- None
0400-48-01-.21(1)(e): “Inspections of existing subsurface sewage disposal systems. Two hundred dollars ($200) per inspection.” source
- What triggers it
- No transfer inspection requirement in 0400-48-01; TDEC inspects existing systems on request for a $200 fee (.21(1)(e)); ATS deed restriction and O&M contract obligation run with the land (.10(2)(c)2-3)
- Annual operating permit
- No
- Fees and periodic programs
- No annual operating permit; the approved maintenance provider pays an annual ATS/SDD 'tracking fee' per system under contract (.23(10)(a), amount not in rule). Construction permit $400 conventional / $500 alternative / $500 experimental plus inspection $100-$200; repair permit free; installer permit $200/yr plus $100 per alternative type (LPP, mound, lagoon, ATS/SDD); pumper permit $200/yr; existing-system inspection $200 (.21)
0400-48-01-.21(1): “Four hundred dollars ($400) up to one thousand (1,000) gpd design flow [conventional] ... Five hundred dollars ($500) [alternative] ... Two hundred dollars ($200) per annual permit for pumpers and installers ... an additional one hundred dollars ($100) applies for each type of alternative system.” source
- Provider list
- https://dataviewers.tdec.tn.gov/dataviewers/f?p=2005:40000
TDEC Licensed Installers & Pumpers page: “The Division of Water Resources DataViewer (link below) will allow you to search for licensed installers and/or pumpers in Tennessee. The search can be narrowed by county and the installer search may also be narrowed by the permit type they hold.” source
- Effective date
- 2013-09-18
Systems in service
| Year | What | Low | Mid | High | Method | |
|---|---|---|---|---|---|---|
| 1990 | All systems | 781,616 | 781,616 | 781,616 | 1990 census | source |
| 2021 | All systems | 1,131,108 | 1,243,491 | 1,370,660 | USGS estimate (2025) | source |
Pumps and aerators
Estimated systems in Tennessee with an aerobic treatment unit (aerator), an effluent or dosing pump, or either. How these are estimated
- With an aerator
- 19,000
- 5,700 to 55,000 · 1% of all systems
- With a pump
- 110,000
- 37,000 to 230,000 · 9% of all systems
- Pump or aerator
- 120,000
- 40,000 to 260,000 · 10% of all systems
Control panels: about 120,000 installed (34,000 to 290,000), about 1,200 new a year and 7,900 replacements a year. How panels are estimated
AssumptionNo state figure was found; a regional assumption with a wide range.
No count found. Southeast prior: aerobic units allowed but uncommon; pumped systems common on poor soils.
Licensed professionals
- 1,785 Installer
- 158 Pumper
Septic companies in Tennessee (1,880)
Sources
- Blount County Installers & Pumpers lists (2021) · Blount County Environmental Health, pdf
- Hamilton County List of Septic Installers and Pumpers 2026 · Hamilton County Groundwater Department, pdf
- Hamilton County Building Inspection App document retrieval (septic permits and certificates of completion) · Hamilton County Development Services, html
- Tennessee active installers and pumpers · TDEC, html/pdf
- Tenn. Comp. R. & Regs. 0400-48-01 Regulations to Govern Subsurface Sewage Disposal Systems · Tennessee Secretary of State / TDEC, pdf
- Sevier County installer (2026-08-20) and pumper (2026-04-27) lists · Sevier County Environmental Health, pdf
- Permitted Active Septic Installers (as of March 15, 2024) · TDEC Division of Water Resources, pdf
- Active Pumpers (as of March 15, 2024) · TDEC Division of Water Resources, pdf
- TDEC Division of Water Resources Contacts for SSDS (field office map and contract counties) · TDEC Division of Water Resources, html
- TDEC Installers & Pumpers DataViewer · TDEC, html
- TDEC Online Application for SSDS Related Services · TDEC Division of Water Resources, html
- Active Approved Soil Consultants (August 31, 2026) · TDEC Division of Water Resources, pdf
- TDEC Subsurface Sewage Disposal System (SSDS) Permits · TDEC Division of Water Resources, html
- SSDS Records Search · TDEC, html
- Williamson County Regulations Governing On-Site Sewage Disposal Systems (Regulations 8-18-2026) · Williamson County Department of Sewage Disposal Management / Board of Health, pdf