Clay County Public Health Center, Environmental Health - Onsite Sewage
- Type
- County
- Area served
- Clay County (DHSS county listing; Kansas City portion not checked)
- Address
- 800 Haines Dr., Liberty, MO 64068
- Phone
- 816-595-4350 (environmental health); main 816-595-4200
- Website
- https://www.clayhealth.com/
- Septic page
- https://www.clayhealth.com/154/Onsite-Sewage
- Counties
- Clay County
Listed by DHSS (OWTS construction permit process page) as the permitting authority under a local onsite wastewater ordinance (authority type: Ordinance), which may add requirements beyond the state minimum construction standards. Permits and inspects systems under 3,000 gpd under its Individual Sewage Disposal Rules and Regulations (eff. 2018-01-01): construction permit $250 (2026 fee schedule); advanced systems designed and stamped by a Missouri PE with a service contract for at least 2 years after installation; service providers must report lapsed contracts.
Local rules
- Administering body
- Clay County Public Health Center
- Statute
- RSMo 701.025-701.059
- Rule
- Clay County Individual Sewage Disposal Rules and Regulations (eff. 2018-01-01), section (9)(A) and drip O&M 3.E
- Maintenance contract for aerobic or advanced units
- Yes, initial period only
Clay County Individual Sewage Disposal Rules (eff. 2018-01-01), section (9)(A): “These systems shall be designed and stamped by a professional engineer licensed in the state of Missouri. ... A service contract requirement for at least 2 years after installation is required on engineered systems.” source
- Initial contract (years)
- 2
Clay County Individual Sewage Disposal Rules, section (9)(A): “A service contract requirement for at least 2 years after installation is required on engineered systems.” source
- Contract for the life of the system
- No
- Reports go to the authority
- Yes
Clay County Individual Sewage Disposal Rules, drip systems 3.E: “E. The service provider shall report to the Health Officer any service contract allowed to lapse.” source
- Fees and periodic programs
- Construction permit $250, additional plan review $50 (2026 environmental health fee schedule). No operating permit found.
- Effective date
- 2018-01-01