Clay County Public Health Center, Environmental Health - Onsite Sewage

Type
County
Area served
Clay County (DHSS county listing; Kansas City portion not checked)
Address
800 Haines Dr., Liberty, MO 64068
Phone
816-595-4350 (environmental health); main 816-595-4200
Counties
Clay County

Listed by DHSS (OWTS construction permit process page) as the permitting authority under a local onsite wastewater ordinance (authority type: Ordinance), which may add requirements beyond the state minimum construction standards. Permits and inspects systems under 3,000 gpd under its Individual Sewage Disposal Rules and Regulations (eff. 2018-01-01): construction permit $250 (2026 fee schedule); advanced systems designed and stamped by a Missouri PE with a service contract for at least 2 years after installation; service providers must report lapsed contracts.

Local rules

Administering body
Clay County Public Health Center
Statute
RSMo 701.025-701.059
Rule
Clay County Individual Sewage Disposal Rules and Regulations (eff. 2018-01-01), section (9)(A) and drip O&M 3.E
Maintenance contract for aerobic or advanced units
Yes, initial period only

Clay County Individual Sewage Disposal Rules (eff. 2018-01-01), section (9)(A): “These systems shall be designed and stamped by a professional engineer licensed in the state of Missouri. ... A service contract requirement for at least 2 years after installation is required on engineered systems.” source

Initial contract (years)
2

Clay County Individual Sewage Disposal Rules, section (9)(A): “A service contract requirement for at least 2 years after installation is required on engineered systems.” source

Contract for the life of the system
No
Reports go to the authority
Yes

Clay County Individual Sewage Disposal Rules, drip systems 3.E: “E. The service provider shall report to the Health Officer any service contract allowed to lapse.” source

Fees and periodic programs
Construction permit $250, additional plan review $50 (2026 environmental health fee schedule). No operating permit found.
Effective date
2018-01-01

Model catalog of installed septic hardware, and septic rules, permitting authorities and licensed providers by state and county. Every fact links to its source. Manufacturer photos are linked, not copied.