Cass County Building Codes, Zoning & Environmental Health

Type
County
Area served
Cass County (DHSS county listing; incorporated cities not checked)
Address
30508 SW Outer Road, Harrisonville, MO 64701
Phone
(816) 380-8134
Counties
Cass County

Listed by DHSS (OWTS construction permit process page) as the permitting authority under a local onsite wastewater ordinance (authority type: Ordinance), which may add requirements beyond the state minimum construction standards. Onsite Wastewater Regulations Ordinance No. 26-03 (approved 2026-02-04): advanced systems designed by a registered installer or PE, site evaluation by a state soil scientist, aerobic treatment units and pump tanks under a manufacturer-spec service contract with a manufacturer-certified provider and an annual settleable-solids test. Posts 2025 lists of MO registered septic installers and inspectors/evaluators.

Local rules

Administering body
Cass County Commission / Building Codes, Zoning & Environmental Health
Statute
RSMo 701.025-701.059
Rule
Cass County Onsite Wastewater Regulations, Ordinance No. 26-03 (approved 2026-02-04), section 7.F.5
License required
Yes
Maintenance contract for aerobic or advanced units
Yes (term not stated)

Cass County Ordinance 26-03, section 7.F.5(a)-(b): “All aerobic treatment units, pump tanks, or any other serviceable equipment identified by the regulatory authority shall have a service contract maintained in accordance with the manufacturer's specifications. b) Any individual or company providing a service shall be certified by the manufacturer of the equipment, or one of its certified agents, when such certification is offered.” source

Homeowner self-maintenance
Not stated

Cass County Ordinance 26-03, section 7.F.5(b)-(c): “b) Any individual or company providing a service shall be certified by the manufacturer of the equipment, or one of its certified agents, when such certification is offered. c) All individuals or a company providing services provide proof of certification upon request of the Administrative Authority.” source

Self-maintenance conditions
Service providers must be certified by the equipment manufacturer or its certified agent when certification is offered; owner self-service not addressed.
Fees and periodic programs
Annual total-suspended-solids (settleable solids) test in the ATU mixed-liquor compartment; results over 75% reported to the regulatory authority and the tank pumped by a licensed pumper.
Effective date
2026-02-04

Model catalog of installed septic hardware, and septic rules, permitting authorities and licensed providers by state and county. Every fact links to its source. Manufacturer photos are linked, not copied.