Camden County, Missouri

Who permits septic systems here

Camden County Wastewater Department

County

Local rules

These add to the state rule on the Missouri page.

Administering body
Camden County Commission / Camden County Wastewater Department
Statute
RSMo 701.025-701.059
Rule
Camden County On-site Sewage Disposal Systems Ordinance No. 12-18-12-04, Sections 2.15, 2.18, 9
License required
Yes
Maintenance contract for aerobic or advanced units
Yes (term not stated)

Camden County Ordinance 12-18-12-04, sections 9.1, 9.3: “9.1 On-site sewage disposal systems installed after on or after January 1, 2011 incorporating an advanced system ... shall not be operated without the issuance of a valid operating permit. ... 9.3 Application for renewal of Operation Permits shall be made upon a form approved by the Wastewater Department and shall include proof of a current maintenance agreement and any service reports along with the applicable operating permit fee.” source

Homeowner self-maintenance
Not stated

Camden County Ordinance 12-18-12-04, section 2.18: “'Registered Service Tech', a repair or service technician trained, authorized and registered as an 'advanced installer' with the Department of Health and the Camden County Wastewater Department.” source

Self-maintenance conditions
Service by a 'Registered Service Tech' registered as an advanced installer with DHSS and the county; owner self-service not addressed.
Reports go to the authority
Yes

Camden County Ordinance 12-18-12-04, sections 9.3-9.4: “shall include proof of a current maintenance agreement and any service reports ... 9.4 A site visit may be required by the Wastewater Department before approving an application for renewal of an operating permit” source

Report channel
Paper

Camden County Ordinance 12-18-12-04, section 9.3: “Application for renewal of Operation Permits shall be made upon a form approved by the Wastewater Department” source

Fees and periodic programs
Operating permit required for advanced systems installed on or after 2011-01-01 and for systems found to cause contamination or a nuisance; renewal application on a county form with proof of a current maintenance agreement, service reports and the operating permit fee (amount and renewal interval not on the page); construction permit $150.

Systems in service (estimates)

YearWhatLowMidHighMethod
2021All systems19,01420,64823,776USGS estimate (2025)source

Pumps and aerators

Estimated systems in Camden County with an aerobic treatment unit (aerator), an effluent or dosing pump, or either. How these are estimated

With an aerator
620
190 to 1,800 · 3% of all systems
With a pump
4,500
2,000 to 8,800 · 22% of all systems
Pump or aerator
4,700
2,100 to 9,500 · 23% of all systems

Assumption State: AssumptionNo county figure: the state's estimate is spread by the county's share of the state's systems.

Model catalog of installed septic hardware, and septic rules, permitting authorities and licensed providers by state and county. Every fact links to its source. Manufacturer photos are linked, not copied.