Camden County, Missouri
Who permits septic systems here
Camden County Wastewater Department
County
- 186 Ha Ha Tonka Cut Thru, Camdenton, MO 65020 (mail: 1 Court Circle, Ste 12, Camdenton, MO 65020)
- Phone: 573-317-3810; sewage complaint hotline 573-317-3821
- Email: jennifer_eblen@camdencountymo.gov
- Septic permit page
- Approved provider list
Local rules
These add to the state rule on the Missouri page.
- Administering body
- Camden County Commission / Camden County Wastewater Department
- Statute
- RSMo 701.025-701.059
- Rule
- Camden County On-site Sewage Disposal Systems Ordinance No. 12-18-12-04, Sections 2.15, 2.18, 9
- License required
- Yes
- Maintenance contract for aerobic or advanced units
- Yes (term not stated)
Camden County Ordinance 12-18-12-04, sections 9.1, 9.3: “9.1 On-site sewage disposal systems installed after on or after January 1, 2011 incorporating an advanced system ... shall not be operated without the issuance of a valid operating permit. ... 9.3 Application for renewal of Operation Permits shall be made upon a form approved by the Wastewater Department and shall include proof of a current maintenance agreement and any service reports along with the applicable operating permit fee.” source
- Homeowner self-maintenance
- Not stated
Camden County Ordinance 12-18-12-04, section 2.18: “'Registered Service Tech', a repair or service technician trained, authorized and registered as an 'advanced installer' with the Department of Health and the Camden County Wastewater Department.” source
- Self-maintenance conditions
- Service by a 'Registered Service Tech' registered as an advanced installer with DHSS and the county; owner self-service not addressed.
- Reports go to the authority
- Yes
Camden County Ordinance 12-18-12-04, sections 9.3-9.4: “shall include proof of a current maintenance agreement and any service reports ... 9.4 A site visit may be required by the Wastewater Department before approving an application for renewal of an operating permit” source
- Report channel
- Paper
Camden County Ordinance 12-18-12-04, section 9.3: “Application for renewal of Operation Permits shall be made upon a form approved by the Wastewater Department” source
- Fees and periodic programs
- Operating permit required for advanced systems installed on or after 2011-01-01 and for systems found to cause contamination or a nuisance; renewal application on a county form with proof of a current maintenance agreement, service reports and the operating permit fee (amount and renewal interval not on the page); construction permit $150.
- Provider list
- https://camdencountymo.gov/wp-content/uploads/2026-CCWW-REGISTERED-MAINTENANCE-TECHNICIAN-LIST.pdf
Systems in service (estimates)
| Year | What | Low | Mid | High | Method | |
|---|---|---|---|---|---|---|
| 2021 | All systems | 19,014 | 20,648 | 23,776 | USGS estimate (2025) | source |
Pumps and aerators
Estimated systems in Camden County with an aerobic treatment unit (aerator), an effluent or dosing pump, or either. How these are estimated
- With an aerator
- 620
- 190 to 1,800 · 3% of all systems
- With a pump
- 4,500
- 2,000 to 8,800 · 22% of all systems
- Pump or aerator
- 4,700
- 2,100 to 9,500 · 23% of all systems
Assumption State: AssumptionNo county figure: the state's estimate is spread by the county's share of the state's systems.