St. Louis County Planning & Zoning, Onsite Wastewater Division

Type
County
Area served
entire county (no city/township SSTS programs in 2025 MPCA report)
Address
Government Services Center, 320 W 2nd St, Duluth, MN 55802; also 201 S 3rd Ave W, Virginia, MN 55792
Phone
218-471-7103
Permit platform
County permit portal crm.stlouiscountymn.gov/Permits (microapp pmseptic; vendor not named)

Regulates SSTS Ordinance 61 and technical standards (amended 2023-03-28). Largest SSTS count in the state: 40,756 systems and 742 construction permits reported for 2025. Septic records by parcel in Land Explorer GIS (gis.stlouiscountymn.gov/landexplorer). Points to the MPCA business search and the MPCA licensed-business map for installers/inspectors; publishes an Inspector Areas PDF.

Local rules

Administering body
St. Louis County Planning & Zoning, Onsite Wastewater Division
Rule
St. Louis County SSTS Ordinance 61 and Technical Standards (amended 2023-03-28)
Inspection at sale
Required by local ordinance

St. Louis County SSTS Ordinance 61 (county buying/selling page): “St. Louis County Subsurface Sewage Treatment System (SSTS) Ordinance 61 requires that prior to the sale, transfer, contract for deed, or any other conveyance of land upon which a dwelling is located an inspection is needed; the county requires 100% of the replacement costs be held in an escrow account at the time of closing.” source

What triggers it
Prior to the sale, transfer, contract for deed or any other conveyance of land with a dwelling or a structure requiring an SSTS. Exempt if a Certificate of Compliance for a new/replacement system issued within 10 years, a Certificate of Compliance for an existing system within 3 years, or a Notice of Nonconforming within 3 years is on file. Non-compliant or ITPH system not replaced before closing: 100% of replacement cost escrowed at closing plus disclosure/transfer agreement; winter sales use the same escrow and inspect when conditions allow.
Who inspects
Inspector
Seller disclosure covers septic
Yes
Fees and periodic programs
Non-compliant: replacement within 12 months (shoreland) or 24 months (non-shoreland); ITPH within 10 months. Fees not published on the page.
Effective date
2023-03-28

Model catalog of installed septic hardware, and septic rules, permitting authorities and licensed providers by state and county. Every fact links to its source. Manufacturer photos are linked, not copied.