Washtenaw County, Michigan

Who permits septic systems here

Local rules

These add to the state rule on the Michigan page.

Administering body
Washtenaw County Health Officer / Environmental Health Division (regulation adopted by the Board of Commissioners)
Statute
MCLA 333.1101 et seq.; MCLA 324.1701 et seq.; MCLA 46.11
Rule
Regulation for the Inspection of Residential Onsite Water and Sewage Disposal Systems at Time of Property Transfer (inspections from 2000-01-03)
Inspection at sale
Required by local ordinance

Washtenaw TOS Regulation Art. III Sec. 3:1: “There shall be no sale, transfer or conveyance of a parcel containing an OWSDS until the following conditions are met: a) The seller files an evaluation report by a Washtenaw County certified inspector to the Division; and, b) The Division determines, based upon such report, that the OWSDS is acceptable, or any necessary remediation is completed, or assured and accepted; and c) The Division authorizes the sale, transfer or conveyance of the parcel.” source

What triggers it
Sale, transfer or conveyance of a parcel with an onsite water and sewage system: a Washtenaw County certified inspector evaluates well and septic, the report is filed with the Division, and the Division must authorize the transfer; a certification within 12 months suffices. Exempt: spouse transfers, life estates, foreclosure, tax-sale redemption, joint-ownership changes, security interests, homes built within 24 months, demolitions, unoccupied new homes
Who inspects
Point-of-sale inspector

Washtenaw TOS Regulation Sec. 3:6: “All inspectors performing evaluations under this Regulation must be registered with the Division and certified before undertaking any evaluations. ... No evaluation reports shall be accepted from individuals not certified by the Division.” source

Fees and periodic programs
Fees adopted under the Public Health Code; paid when the inspection report is filed and before transfer (TOS fee schedule not read)

Washtenaw TOS Regulation Art. V Sec. 5:1: “Fees shall be paid when inspection reports are filed with the Division. Fees must be paid before the property is transferred.” source

Effective date
2000-01-03

Washtenaw TOS Regulation Sec. 1:5: “provided, however, that actual inspections shall not begin before January 3, 2000, to insure that a sufficient number of inspectors are certified and available.” source

Systems in service (estimates)

YearWhatLowMidHighMethod
2021All systems26,90631,14033,145USGS estimate (2025)source

Pumps and aerators

Estimated systems in Washtenaw County with an aerobic treatment unit (aerator), an effluent or dosing pump, or either. How these are estimated

With an aerator
930
290 to 2,700 · 3% of all systems
With a pump
6,800
3,000 to 13,000 · 22% of all systems
Pump or aerator
7,200
3,200 to 14,000 · 23% of all systems

Assumption State: AssumptionNo county figure: the state's estimate is spread by the county's share of the state's systems.

Model catalog of installed septic hardware, and septic rules, permitting authorities and licensed providers by state and county. Every fact links to its source. Manufacturer photos are linked, not copied.