Barry County, Michigan
Who permits septic systems here
Barry-Eaton District Health Department
Health district
- 1033 Health Care Drive, Charlotte, MI 48813
- Phone: 517-543-2430
- Septic permit page
- Approved provider list
Local rules
These add to the state rule on the Michigan page.
- Administering body
- Barry-Eaton District Health Department, Environmental Health Division
- Statute
- Public Health Code, Act 368 of 1978
- Rule
- BEDHD Sanitary Code Regulating Sewage Disposal and Water Supply (effective 2000-04-03), Article IV Section VIII Alternative On-Site Wastewater Treatment/Disposal Systems
- License required
- Yes
BEDHD Sanitary Code Art. IV Sec. VIII(c): “Alternative on-site sewage treatment/disposal systems shall be installed by the home owner or only by installers that have been certified for alternative wastewater treatment systems and hold a current license to install alternative wastewater treatment systems as issued by the Barry-Eaton District Health Department” source
- License classes
- Installer (advanced)
- What triggers it
- No time-of-sale/transfer requirement appears on the current On-Site Sewage Systems page, in the 2000 sanitary code or in the FY27 fee schedule; the state row records the 2007 TOST program as repealed in March 2018, but no repeal document was reachable this session.
- Fees and periodic programs
- Alternative systems (lagoons, single and multiple pass sand filters, others) need sealed plans, a designer inspection schedule and an owner waste management plan, and may only be installed by the homeowner or a BEDHD-certified alternative system installer; the Department may impose fees covering inspection and monitoring of alternative systems. FY27 fees: alternative system plan review and permit $1,333 new construction, $809 replacement; certified installer fee for specialized system installers $207.
BEDHD Sanitary Code Art. IV Sec. VIII(d): “The Department may impose fees equal to the cost of providing inspections and monitoring of alternative wastewater treatment/disposal systems.” source
Systems in service (estimates)
| Year | What | Low | Mid | High | Method | |
|---|---|---|---|---|---|---|
| 2021 | All systems | 20,894 | 23,490 | 24,440 | USGS estimate (2025) | source |
Pumps and aerators
Estimated systems in Barry County with an aerobic treatment unit (aerator), an effluent or dosing pump, or either. How these are estimated
- With an aerator
- 710
- 220 to 2,000 · 3% of all systems
- With a pump
- 5,100
- 2,300 to 10,000 · 22% of all systems
- Pump or aerator
- 5,400
- 2,400 to 11,000 · 23% of all systems
Assumption State: AssumptionNo county figure: the state's estimate is spread by the county's share of the state's systems.