Massachusetts septic rules

Massachusetts Department of Environmental Protection (MassDEP) · Title 5 / Septic Systems. Statute: M.G.L. c. 21A, s. 13 (State Environmental Code). Rule: 310 CMR 15.000 (Title 5).

For homeowners in Massachusetts

  • Local agencies permit septic systems under the state rule (310 CMR 15.000 (Title 5)). Find yours in the county list below.
  • A maintenance contract is required for aerobic units (the rule does not state a term).
  • Homeowners may not maintain their own aerobic unit; a licensed provider must.
  • Selling a home triggers a septic inspection statewide.

Counties

The office that permits septic systems in each county, with the estimated number of systems and how many have an aerator or a pump. ● marks counties whose pump and aerator figures come from county records; the rest spread the state estimate.

CountyPermitting authorityPhoneSystems (USGS mid)With an aeratorPump or aeratorLocal rules
Barnstable CountyBarnstable County Department of Health and Environment(508) 375-6613 (fax 508-362-2603); I/A compliance 774-330-3019 option 328,8942,6604,394●Yes
Berkshire CountyAdams Board of Health413-743-8300 ext. 123 (fax 413-743-8309)30,9225392,394
Bristol CountyFall River Health Department / Board of Health508-324-2410; City 508-324-200038,4486702,977
Dukes CountyEdgartown Health Department / Board of Health508-627-6120 (cell 774-563-0531)7,6426001,059●
Essex CountyHaverhill Health Department / Board of Health (Health & Inspection Services)978-374-2338 (fax 978-374-2337)31,0575412,405
Franklin CountyFranklin Regional Council of Governments, Cooperative Public Health Service (CPHS)FRCOG 413 774-316720,0393491,552
Hampden CountyChicopee Health Department / Board of Health413-594-3557 ext. 366 (fax 413-594-1673)28,7245012,224
Hampshire CountyAmherst Public Health Department / Board of Health413-259-3077 (fax 413-259-2404); Inspection Services 413-259-303026,7984672,075
Middlesex CountyCambridge Public Health Department617-665-380036,1956312,803
Nantucket CountyNantucket Health Department / Board of Health508-228-7200 ext. 7014 or 7020 (fax 508-325-6117)4,1457851,034●
Norfolk CountyBrookline Department of Public Health / Board of Health617-730-230013,3712331,035
Plymouth CountyBridgewater Health Department / Board of Health508-697-090343,7727633,389
Suffolk CountyBoston Public Health Commission617-534-5395136211
Worcester CountyFitchburg Health Department / Board of Health978-829-1870 (fax 978-829-1962); City 978-829-180091,4581,5947,082

What the state rule requires

Administering body
MassDEP issues Title 5 (310 CMR 15.000), approves I/A technologies, System Inspectors and Soil Evaluators; local boards of health issue Disposal System Construction Permits and Certificates of Compliance and receive inspection reports; MassDEP is approving authority for state/federal facilities and large/shared systems

mass.gov Innovative Technology and Title 5 Systems; Buying or Selling guide: “MassDEP must review and approve any I/A technology for use in Massachusetts. The local board of health also needs to review and approve plans ... The System Inspector is responsible for submitting the inspection report directly to the Board of Health. Inspection forms for State and Federal facilities must be submitted to MassDEP; reports for large and shared systems go to both.” source

Administration model
State rule, local agencies permit
Statute
M.G.L. c. 21A, s. 13
Rule
310 CMR 15.000
License required
Yes

310 CMR 15.340; mass.gov training and licensing page: “Individuals become approved Soil Evaluators or System Inspectors by taking a designated class and passing a written examination. NEIWPCC administers classes and examinations on behalf of the Commonwealth. All System Inspectors and Soil Evaluators must renew their approvals on a 3-year cycle ($100 fee, 10 TCHs).” source

License classes
inspector_pos;site_evaluator

310 CMR 15.340; 15.018: “Only MassDEP-approved individuals can conduct system inspections. NEIWPCC maintains lists of approved system inspectors and soil evaluators. (Installers and septage haulers are permitted by local boards of health, not listed here.)” source

Maintenance contract for aerobic or advanced units
Yes (term not stated)

310 CMR 15.287(9); mass.gov I/A guide: “MassDEP requires that owners of alternative systems have a maintenance contract with a specifically licensed individual or company, and the local board of health can require the owner to provide a copy of a valid operation & maintenance (O&M) contract. 15.287(9): The system owner shall maintain an operation and maintenance contract with a Massachusetts certified operator.” source

Homeowner self-maintenance
Not allowed

310 CMR 15.287(9) (via LII): “The system owner shall maintain an operation and maintenance contract with a Massachusetts certified operator [where required, otherwise with a qualified person]. No duration stated.” source

Self-maintenance conditions
Owner must keep an operation and maintenance contract with a Massachusetts certified operator (where required) or other qualified person; mass.gov: maintenance contract with a specifically licensed individual or company
Reports go to the authority
Yes

310 CMR 15.287; mass.gov approved I/A page: “In each case, the system owner must follow the inspection and testing schedule required by the approval. Monitoring and sampling shall be performed in accordance with a plan approved by the Department.” source

Monitoring wording
310 CMR 15.287(2): monitoring and sampling shall be performed in accordance with a plan approved by the Department. No telemetry, remote-monitoring or alarm provision found in 15.287 (read via LII summary; mass.gov regulation PDF returns 403 to fetchers). Technology approval letters (e.g. SludgeHammer general use) require notifying MassDEP and the board of health within five days of a system failure or alarm.

310 CMR 15.287(2) (via LII): “Monitoring and sampling shall be performed in accordance with a plan approved by the Department. Deed notice must be recorded in the chain of title before Certificate of Compliance (15.287(5),(10)).” source

Inspection at sale
Required statewide

310 CMR 15.301-15.305: “Within 2 years before a sale. If weather conditions prevent inspection at the time of a sale, the inspection must take place within 6 months afterward ... If the system is pumped once per year following the date of the inspection, then the inspection remains valid for three years.” source

What triggers it
Title 5 inspection within 2 years before transfer of title (within 6 months after if weather prevented it); valid 3 years with annual pumping records; exemptions: transfers between spouses, parents-children, full siblings, into trust, refinancing, mortgage, no-new-party ownership changes, BOH upgrade agreement, MassDEP-approved local inspection plan; condominiums every 3 years; large systems on basin schedule then every 5 years

310 CMR 15.301(1)-(4): “Title 5 does not require a system inspection if the transfer is of residential real property and is between current spouses; between parents and their children; between full siblings; and where the property is held in a trust. Also exempt: refinancing, taking of a security interest, change in guardian/trustee, no-new-party ownership changes, enforceable BOH upgrade agreement, MassDEP-approved comprehensive local inspection plan.” source

Who inspects
Point-of-sale inspector

310 CMR 15.340: “Only MassDEP-approved individuals can conduct system inspections ... System inspections conducted by any other individual are not valid for compliance with Title 5. The inspection report must be submitted within 30 days of the inspection.” source

Seller disclosure covers septic
Yes

310 CMR 15.301(2); mass.gov guide: “The buyer or other person acquiring title to the property served by the system must receive a copy of the inspection report. For transfers with special requirements the transferring entity must notify the buyer in writing of the requirements of 310 CMR 15.300-15.305.” source

Approved product list
https://www.mass.gov/info-details/approved-title-5-innovativealternative-technologies

310 CMR 15.280-15.289: “MassDEP must approve an innovative/alternative septic-system technology before it can be used ... 4 categories: General Use, Provisional Use, Piloting, Remedial Use. Best Available Nitrogen Reducing Technology general-use approvals currently at 19 mg/L TN (SeptiTech STAAR, Orenco AdvanTex AX20).” source

Provider list
https://www.mass.gov/guides/hiring-title-5-system-inspectors-and-soil-evaluators

mass.gov hiring page: “The New England Interstate Water Pollution Control Commission maintains lists of approved system inspectors (see below).” source

Systems in service

YearWhatLowMidHighMethod
1990All systems659,120659,120659,1201990 censussource
2021All systems295,825401,601530,609USGS estimate (2025)source

Pumps and aerators

Estimated systems in Massachusetts with an aerobic treatment unit (aerator), an effluent or dosing pump, or either. How these are estimated

With an aerator
7,000
4,800 to 10,000 · 2% of all systems
With a pump
28,000
12,000 to 59,000 · 7% of all systems
Pump or aerator
31,000
14,000 to 63,000 · 8% of all systems

Control panels: about 31,000 installed (12,000 to 69,000), about 310 new a year and 2,100 replacements a year. How panels are estimated

CountedAn official count or peer-reviewed estimate of aerobic units exists for this state.

Aerators counted: 4,793 aerated I/A units in the Barnstable County tracking database (Cape, Islands and participating towns); statewide adds other towns. Pump-only: pressure-dosed Title 5 systems, no count.

Licensed professionals

Septic companies in Massachusetts (1,162)

Sources

Model catalog of installed septic hardware, and septic rules, permitting authorities and licensed providers by state and county. Every fact links to its source. Manufacturer photos are linked, not copied.