Tazewell County Health Department, Environmental Health (Sewage)
- Type
- County
- Area served
- Tazewell County (Tazewell County Code 94.25-94.36, 6 TCC 1-13)
- Address
- 21306 Illinois Route 9, Tremont, IL 61568-9252 (also Pekin office)
- Phone
- 309-929-0272
- EH@tchd.net
- Septic page
- https://www.tazewellhealth.org/187/Sewage
- Counties
- Tazewell County
Reviews applications and issues permits, inspects new and repaired systems, runs an effluent testing program for discharging systems (sample bottles $48 including lab), investigates complaints, and requires homeowner septic training within 60 days of a new/altered system. Annual registration of installers and pumpers, and of septic tank manufacturers and aeration unit dealers / maintenance providers (no fee). Annual Surface Discharge System Operating Permit for surface-discharging systems. Operational inspection forms for property sales (recommended, not required).
Local rules
- Administering body
- Tazewell County Board of Health / Tazewell County Health Department
- Rule
- Tazewell County Code 94.25-94.36 (6 TCC 1-13) Sewage Disposal
- Maintenance contract for aerobic or advanced units
- Yes, for the life of the system
Tazewell County Code 94.27(b) (Compliance and Performance): “Owners whose property is served by an aerobic unit and/or has a surface discharging system are required to have at all times an active contract to inspect the operation and ensure proper maintenance of the system.” source
- Contract for the life of the system
- Yes
Tazewell County Code 94.27(b): “Owners whose property is served by an aerobic unit and/or has a surface discharging system are required to have at all times an active contract to inspect the operation and ensure proper maintenance of the system.” source
- Homeowner self-maintenance
- Allowed
Tazewell County Code 94.27(b): “The homeowner of an ATU may conduct the inspection and maintenance as defined within the Act, but the inspection and maintenance shall be performed per the manufacturer's requirements to assure proper operation.” source
- Self-maintenance conditions
- The homeowner of an ATU may do the inspection and maintenance 'as defined within the Act', following the manufacturer's requirements; otherwise ATU inspection and maintenance is by a manufacturer's authorized service representative / certified installation contractor. Owners of new or altered systems must complete department-approved septic training within 60 days.
- Service visits per year
- 2
Tazewell County Code 94.27(b)(1): “Aerobic Treatment Units - once every six months. Inspection and maintenance must be performed by a manufacturer's authorized service representative.” source
- Reports go to the authority
- Yes
Tazewell County Code 94.27(c): “must meet the Illinois Department of Public Health effluent standards and be sampled a minimum of once a year ... Sample results must be submitted to the Tazewell County Health Department within 45 days of the date the sample was collected.” source
- Report channel
- Not stated
Tazewell County Code 94.27(c): “Sample results must be submitted to the Tazewell County Health Department (no channel named); sample bottles are bought and returned at the TCHD office” source
- Electronic monitoring in the rule
- None found
Tazewell County Code 94.25-94.36: “All existing surface discharging systems whose effluent leaves their property or has the potential to leave their property must meet the Illinois Department of Public Health effluent standards and be sampled a minimum of once a year.” source
- Monitoring wording
- Surface-discharging systems whose effluent can leave the property are sampled at least once a year; results to TCHD within 45 days; NPDES ILG62 sampling for systems installed or repaired after 2014-02-10. No alarm or telemetry provision in the county text (state 905.20(k) alarm applies).
- Inspection at sale
- None
Tazewell County Code 94.27(d): “An operational inspection is recommended for any private sewage disposal system, which is part of a sale of property or an exchange of ownership prior to closing.” source
- What triggers it
- An operational inspection is 'recommended' before closing; if one is done, corrections are completed or escrowed, the buyer documents them within 60 days and the new owner completes training within 30 days; inspections valid 90 days; pre-August-1997 systems lose their exemption on transfer; since 2005-06-16 the department may require a licensed contractor to verify a functioning system at transfer when no permit is on record
- Who inspects
- Installer
Tazewell County Code 94.27(g): “An operational inspection may be conducted by a private sewage disposal installation contractor registered with the County Health Department or an authorized representative of the Health Department.” source
- Annual operating permit
- Yes
Tazewell County Code (Surface Discharge System Operating Permit article): “No person shall operate, occupy or permit occupancy of any dwelling served by a private sewage disposal system designed for surface discharge or have the potential for surface discharge without a valid operation permit issued by the Health Department. ... The fee shall be collected by the Health Department on an annual basis” source
- Fees and periodic programs
- Annual Surface Discharge System Operating Permit (fee set by the Board of Health, due December 31); effluent sample bottle $48; subdivision review $100 + $25/lot; annual contractor and pumper registration; free annual ATU dealer / maintenance registration
- Provider list
- https://www.tazewellhealth.org/DocumentCenter/View/2250/2026-Septic-Contractors-List
TCHD Sewage page: “2026 Septic Contractors List” source