Hall County Environmental Health Department (Hall County Board of Health)
- Type
- County
- Area served
- Hall County
- Address
- 2875 Browns Bridge Road, 3rd Floor, Gainesville, GA 30504 (mail: P.O. Box 5901, Gainesville, GA 30504)
- Phone
- 770-531-3973
- Provider list
- https://dph.georgia.gov/media/92731/download
- Counties
- Hall County
County board of health issues construction permits and inspects under DPH rule 511-3-1 and the DPH manual; environmental health staff are organized by DPH public health district. A section of DPH hosted on the county government site; fax 770-531-6767; hours M-F 8-5, applications 8-4:30. Septic permit, repair, performance evaluation and septage removal applications as PDFs; contractors call 8-9 am for same-day inspections. Local Board of Health resolution (approved 2005-08-25) requires an annual operating permit and maintenance for advanced treatment systems: see rules row auth-ga-hall-county. Fee schedule eff. 2024-01-01: https://www.hallcounty.org/DocumentCenter/View/11974 (xls). District 2 EH director Jennifer Kinsey 770-535-5887.
Local rules
- Administering body
- Hall County Board of Health / Hall County Environmental Health Department (DPH District 2)
- Statute
- O.C.G.A. 31-3-5(b)(6)
- Rule
- Hall County Board of Health resolution 'Operational Permits and Maintenance Requirements for Advanced Treatment Systems' (approved 2005-08-25)
- Maintenance contract for aerobic or advanced units
- Yes, for the life of the system
Hall County BOH resolution, Operating Permit Requirements 2(b); Permit Renewal Requirements 1(a): “Copy of the current and renewal service agreement.” source
- Contract for the life of the system
- Yes
- Homeowner self-maintenance
- Not stated
Hall County BOH resolution, Maintenance Contractor Requirements 1: “Be certified by the manufacturer to perform service with written documentation provided to the county environmental health department, OR Have equivalent certification as established by the Department.” source
- Self-maintenance conditions
- Maintenance must be by a 'Maintenance Contractor' certified by the manufacturer (or with equivalent DPH certification); the resolution does not address owner self-service
- Reports go to the authority
- Yes
Hall County BOH resolution, Permit Renewal Requirements 1(c); Maintenance Requirements 3: “Copies of the service inspection reports. ... A field inspection report that specifies the areas of inspection, and has been approved by the county environmental health department shall be used.” source
- Report channel
- Paper
Hall County BOH resolution, Permit Renewal Requirements 1-2: “If the proper paperwork is submitted as required, the environmental health office will mail the renewal of the operating permit to the current homeowner.” source
- Electronic monitoring in the rule
- None found
Hall County BOH resolution, Maintenance Requirements 1-3: “The Advanced Treatment System shall be operated in accordance with the manufacturer requirements and all applicable state rules and regulations.” source
- Monitoring wording
- No telemetry, remote-monitoring or alarm provision in the resolution; it defers to the state manual for maintenance requirements
- Inspection at sale
- None
Hall County BOH resolution, Operating Permit Requirements 7: “Upon sale or transfer of the property served by an Advanced Treatment System, a notification should be filed with the deed stating that the property's on-site sewage management system utilizes an Advanced Treatment System and will require regularly scheduled maintenance.” source
- What triggers it
- No inspection at sale; 'Upon sale or transfer of the property ... a notification should be filed with the deed' that the system uses an advanced treatment system requiring scheduled maintenance
- Annual operating permit
- Yes
Hall County BOH resolution, Operating Permit Requirements 1, 3: “An annual operating permit shall be required for Advanced Treatment Systems and all components thereof.” source
- Fees and periodic programs
- Annual operating permit for advanced treatment systems (NSF 40 Class I); current re-inspection fee charged when renewal paperwork is late or non-compliant; amounts in the Hall County EH fee schedule eff. 2024-01-01 (xls, 'Adv. Trtmt Sys.' line) not legible
Hall County BOH resolution, Permit Renewal Requirements 3: “If the proper paperwork is not turned in within 30 days or is not in compliance, a re-inspection will be performed. The current re-inspection fee will be applicable.” source
- Provider list
- https://dph.georgia.gov/media/92731/download
- Effective date
- 2005-08-25