Adams County Health Department, Environmental Health Water Quality Team (Septic Systems)
- Type
- County
- Area served
- Adams County (FIPS 08001)
- Address
- 4430 South Adams County Parkway, Brighton, CO 80601
- Phone
- 303.288.6816 (main 303.220.9200)
- Permit platform
- myhealthdepartment.com (https://myhealthdepartment.com/adcogoveh)
- Septic page
- https://adamscountyhealthdepartment.org/onsite-wastewater-treatment-systems-septic-systems
- Counties
- Adams County
Regulation O-26 effective January 5, 2026. Use/transfer of title permit required to sell in most cases (4.2-4.3), inspection dated within 12 months; also triggered by added flow, change of use, modular/mobile home connection. Section 5: renewable Use Permit for higher level treatment systems with reduced STA or separation and for non-pressurized drip dispersal installed from 2026-01-01; O&M contract of at least one year; maintenance providers report findings and alarm conditions and must hold NAWT O&M 1 and 2 certification within two years. Septic System Lookup Tool (ArcGIS). CDPHE Comparison of Local OWTS Regulations chart (updated 7/10/2024) lists the former Tri-County Health Department for Adams (TOT Yes, renewable Yes).
Local rules
- Administering body
- Board of Health of Adams County / Adams County Health Department under Regulation O-26
- Administration model
- State rule, local agencies permit
- Rule
- Adams County Board of Health Regulation O-26 On-Site Wastewater Treatment Systems (eff. 2026-01-05), Sections 4-5
- Inspection at sale
- Required by local ordinance
Adams County Regulation O-26, 4.2.A-B: “The owner or seller of a property served by an OWTS shall obtain an inspection report and the issuance of a Use Permit, as applicable, dated within 12 months prior to the occurrence of one (1) or more of the following events: 1) The sale of the property ... if the property owner does not obtain a use permit prior to a covered transaction, the purchaser of the property is then required to obtain a Use Permit.” source
- What triggers it
- Use Permit with an inspection report dated within 12 months required before sale (excluding spouse/child, life estate, foreclosure transfers); purchaser must obtain it if the seller does not
- Who inspects
- Point-of-sale inspector
- Fees and periodic programs
- Renewable Use Permit - Higher Level Treatment (Section 5) for reduced-STA HLT systems and non-pressurized drip dispersal (from 2026-01-01), maintained and renewed until the system is abandoned; fee set by Board resolution (2026 licensing and inspections fees page, amounts not read)
- Effective date
- 2026-01-05