Santa Cruz County Environmental Health (Land Use, Sewage Disposal and Wastewater Management)
- Type
- County
- Area served
- Santa Cruz County
- Address
- 701 Ocean Street, 3rd Floor, Room 312, Santa Cruz, CA 95060
- Phone
- 831-454-2022
- Website
- https://scceh.org/
- Counties
- Santa Cruz County
Local agency for OWTS under the State Water Board OWTS Policy (LAMP contact list). Department and contacts from the county page (read 2026-11-01). Point-of-sale: since 2023-07-01 a septic inspection report (pumping report within 12 months of closing, leach field flow test of at least 250 gallons) is required when rural real estate is transferred; repairs may be transferred to the buyer (90 days) by form (https://scceh.org/NewHome/Programs/LandUse/RuralRealEstateSales.aspx, read 2026-11-01). Page also lists EnvironmentalHealth@santacruzcounty.us for appointments. Central Coast table: LAMP approved 2021-10-14; LAMP page https://scceh.com/NewHome/Programs/LandUse/LocalAgencyManagementProgram.aspx.
Local rules
- Administering body
- Santa Cruz County Environmental Health (Land Use, Sewage Disposal and Wastewater Management)
- Rule
- Santa Cruz County Code 7.38.216 (OWTS point of sale)
- Inspection at sale
- Required by local ordinance
Santa Cruz County EH Rural Real Estate Sales page (County Code 7.38.216): “Beginning July 1, 2023, when Rural Real Estate is transferred, a septic tank inspection report must be completed, and a disclosure form that describes possible concerns with an OWTS must be completed by the seller and buyer (County Code Section 7.38.216).” source
- What triggers it
- Since 2023-07-01, at transfer of Rural Real Estate served by an OWTS the seller completes a septic tank inspection report (pumping report within 12 months before close of escrow with a leach-field flow test of at least 250 gallons by flow meter) and a disclosure form signed by seller and buyer. Failures or structural defects are repaired under EH permit before sale, or the buyer takes responsibility by a Transfer of Responsibility form and completes the work within 90 days of close of escrow (extensions possible). Structures over the tank must be removed or covered by the transfer form. Enhanced treatment systems: OSSP inspection report within 6 months before close of escrow and a new OSSP service agreement. Exempt: public sewer, undeveloped parcels, new OWTS installed under permit within 5 years, OWTS repaired or upgraded under permit within 3 years, transfers without consideration or between co-owners (gifts, joint-tenancy deaths, probate, trust distributions).
Santa Cruz County EH Rural Real Estate Sales page, OWTS FAQ: “The pumping report must have been completed within 12 months prior to the close of escrow, and it must also include a flow test of the leach field using at least 250 gallons as measured with a flow meter.” source
- Who inspects
- Pumper
- Seller disclosure covers septic
- Yes
- Fees and periodic programs
- Enhanced treatment systems must be regularly inspected and serviced by an approved Onsite Systems Service Provider (not point-of-sale); separate well/IWS water quality and yield testing at transfer since 2025-09-01 (Code 7.73.075)
- Effective date
- 2023-07-01
Santa Cruz County EH Rural Real Estate Sales page: “Beginning July 1, 2023, when Rural Real Estate is transferred, a septic tank inspection report must be completed” source