Riverside County Department of Environmental Health, Environmental Protection and Oversight Division, Land Use and Water Resources Program
- Type
- County
- Area served
- Unincorporated Riverside County; under MOUs DEH also does planning review and plan check (and OWTS installation inspection in Coachella, Corona, Lake Elsinore, Menifee, Murrieta, Wildomar) for 14 cities; other cities have no formal agreement (LAMP Appendix X)
- Address
- 4080 Lemon St, 10th Floor, Riverside, CA 92501 (Land Use, septic); Indio office 47-950 Arabia St, Suite A, Indio, CA 92201 (760-863-7570)
- Phone
- 951-955-8980
- DEHOWTS@rivco.org
- Website
- https://rivcoeh.org/
- Septic page
- https://rivcoeh.org/septic-systems
- Counties
- Riverside County (partial)
LAMP (supported by County Ordinance 650): https://rivcoeh.org/sites/g/files/aldnop361/files/migrated/Portals-0-PDF-Land-Use-LAMP-2022.pdf . Revised LAMP approved by Colorado River RWQCB Resolution R7-2024-0039 (2024-11-12). Professionals of Record and Qualified Service Providers must register with DEH (LAMP ch. 4); a certification of the existing system by a registered QSP is required for repairs and modifications. Alternative treatment systems: QSP service agreement and annual QSP inspection with results to DEH within 45 days; ATUs need an annual operating permit; commercial ATS also need a recorded right of entry.
Local rules
- Administering body
- Riverside County DEH under its LAMP (Tier 2) and Ordinance 650
- Administration model
- State rule, local agencies permit
- Rule
- Riverside County LAMP (2022-11-17) ch. 4, 6, 7; Ordinance 650
- Maintenance contract for aerobic or advanced units
- Yes (term not stated)
Riverside LAMP ch. 6, ATS Operation and Maintenance item 1: “Maintain a service agreement with a QSP trained by the manufacturer. Agreement must be provided prior to final sign-off on the ATS.” source
- Homeowner self-maintenance
- Not allowed
- Self-maintenance conditions
- ATS service agreement with a QSP trained by the manufacturer; QSPs register with DEH
- Service visits per year
- 1
Riverside LAMP ch. 6, item 2: “At a minimum, ATS shall be inspected by QSP annually ... The QSP shall provide copies of the inspection results to this Department within 45 days of the date of inspection.” source
- Reports go to the authority
- Yes
- Report channel
- Not stated
- Electronic monitoring in the rule
- Required for some systems
- Monitoring wording
- LAMP restates OWTS Policy 10.14 for Tier 3 supplemental treatment: visual or audible alarm and a telemetric alarm; owner inspection monthly where telemetry is not possible.
- Alarm required
- Yes
- Inspection at sale
- None
Riverside LAMP ch. 7: “An OWTS Certification shall be required for the following: 1. For any repair and/or modifications performed to an existing OWTS. 2. For any new construction/modification on a property that utilizes an OWTS.” source
- What triggers it
- No sale trigger found; an OWTS Certification by a registered PR/QSP is required for repairs, new construction/modification on a parcel with an OWTS, or projects using an existing OWTS
- Annual operating permit
- No
Riverside LAMP ch. 6, item 3: “Residential projects shall comply with items 1 and 2. Commercial projects will comply with all items ... A renewable operating permit issued by this Department as required by Ordinance 650.” source
- Fees and periodic programs
- Commercial ATS: renewable operating permit under Ordinance 650 and recorded right-of-entry; residential ATS: service agreement and annual QSP inspection only