Contra Costa Health, Environmental Health Division, Land Use Program
- Type
- County
- Area served
- Contra Costa County
- Address
- 2120 Diamond Boulevard, Suite 100, Concord, CA 94520
- Phone
- 925-608-5500 (fax 925-608-5502)
- Septic page
- https://www.cchealth.org/health-and-safety-information/orders-and-regulations/land-use-program
- Counties
- Contra Costa County
Not on the State Water Board LAMP contact list; the Central Valley RWQCB external-review table records a Contra Costa County LAMP received 2016-12-01 (Region 2 lead), so the county is the local agency. Read 2026-11-01 in a browser: the Land Use Program "protects public health by reviewing design plans and inspecting the construction of septic systems, also known as on-site wastewater treatment systems (OWTSs)" and reviews building plans for properties with septic systems or wells, countywide. Division contact block: 2120 Diamond Boulevard, Suite 100, Concord; P 925-608-5500, F 925-608-5502; Mon-Fri 7:30-4:30. No email on the pages.
Local rules
- Administering body
- Contra Costa Health, Environmental Health Division, Land Use Program
- Rule
- Contra Costa County Ordinance Code ch. 420-6 (sec. 420-6.810(b)); Health Officer Regulations for Sewage Collection and Disposal sec. 503 (effective with Ordinance No. 2018-25)
- Reports go to the authority
- Yes
Contra Costa Health Officer Regulations sec. 503.B.1: “A written report on an inspection conducted under Subsection 503.A. of these Regulations must be prepared by the qualified inspector who conducted the inspection and submitted to the health officer.” source
- Report channel
- Not stated
- Fees and periodic programs
- Alternative OWTS (with intermittent or recirculating sand filters or proprietary supplemental treatment units) must be monitored: a qualified inspector inspects on the owner's behalf (disposal field, treatment unit, pump tank, septic tank, alarms, performance wells) within 60 days before each report deadline and submits a written report to the health officer: initial report within one year of occupancy or final approval, a second report one year later for systems built after the regulations took effect, then every five years. Fees not read.